| Location: | Connecticut |
|---|---|
| Posted: | Jan 26, 2026 |
| Due: | Mar 9, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 34544 |
| Publication URL: | To access bid details, please log in. |
In 2024, the Town of Mansfield contracted with Design Learned Inc. (DLI) to provide a study with conceptual design to determine the size of the replacement Animal Control facility needed. This study addressed the current and future Animal Control needs of the Town while taking into account new state Animal Shelter requirements that go in into effect on January 1, 2029. The study determined the required size of the facility needed with a conceptual floor plan and building design. In 2025 the Town of Mansfield contracted with Jacobson Engineering to conduct a feasibility study to determine if the new facility would be able to be built on the existing site currently occupied by the Town of Mansfield Animal Control Shelter. The DLI Study and Jacobson Engineering Study Development Documents are included as Appendix A.
Sheri Baczanski 4 SOUTH EAGLEVILLE ROAD STORRS CT, 06268 United States Tel: 8604293331 Fax: baczanskise@mansfieldct.org

With GovernmentContracts, you can:
Yard Waste Grinding and Removal Services This RFP is being posted to this
State Government of Connecticut
Bid Due: 6/24/2026
Installation & Revision of Traffic Control Signals - Various Cities/Towns in D3 Start
State Government of Connecticut
Bid Due: 7/01/2026
***UPDATED 06-05-2026*** Request for Qualifications (RFQ) Regional Freight Study WestCOG seeks to engage
Western Connecticut Council of Governments
Bid Due: 7/15/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Bid Due: 6/24/2026