| Location: | Connecticut |
|---|---|
| Posted: | Jan 26, 2026 |
| Due: | Mar 9, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 34544 |
| Publication URL: | To access bid details, please log in. |
In 2024, the Town of Mansfield contracted with Design Learned Inc. (DLI) to provide a study with conceptual design to determine the size of the replacement Animal Control facility needed. This study addressed the current and future Animal Control needs of the Town while taking into account new state Animal Shelter requirements that go in into effect on January 1, 2029. The study determined the required size of the facility needed with a conceptual floor plan and building design. In 2025 the Town of Mansfield contracted with Jacobson Engineering to conduct a feasibility study to determine if the new facility would be able to be built on the existing site currently occupied by the Town of Mansfield Animal Control Shelter. The DLI Study and Jacobson Engineering Study Development Documents are included as Appendix A.
Sheri Baczanski 4 SOUTH EAGLEVILLE ROAD STORRS CT, 06268 United States Tel: 8604293331 Fax: baczanskise@mansfieldct.org

With GovernmentContracts, you can:
...Address Management and Sub-Addressing Feasibility Study Status: Closes: Open 8/5/2026 2:00 PM...
Town of Windsor
Bid Due: 8/05/2026
...Request for Proposals for Consultant to Conduct a Feasibility Study and Propose This ...
State Government of Connecticut
Bid Due: 7/27/2026
...Title Number Start Date End Date Status Request for Proposals ("RFP") for Feasibility ...
Town of Wilton
Bid Due: 7/29/2026
..., is a trail feasibility study to link the Farmington Canal Heritage Trail ...
State Government of Connecticut
Bid Due: 8/07/2026