| Location: | Georgia |
|---|---|
| Posted: | Jan 26, 2026 |
| Due: | Mar 2, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-62250-NONST-2026-000000013 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-62250-NONST-2026-000000013 | Senior Center - New Construction - Request for Qualifications | Carrollton, City Of |
Jan 26, 2026 @ 04:04 PM
|
Mar 02, 2026 @ 02:00 PM
|
Start Date: Jan 26, 2026 @ 04:04 PM ET
End Date:
Mar 02, 2026 @ 02:00 PM ET
A. Pre-Design & Programming
1. Review and confirm project program and functional requirements.
2. Conduct site evaluation, geotechnical studies, and utility assessments.
3. Develop preliminary schematic designs and cost models.
B. Design Phase
1. Prepare architectural, structural, civil, mechanical, electrical, plumbing, and kitchen design documents.
2. Provide design development and construction drawings for all disciplines that are in compliance with local, state, and federal regulations.
3. Incorporate energy-efficient and sustainable design elements.
C. Pre-Construction Services
1. Provide and manage required budgets throughout all stages of the design.
2. Provide the team with value engineering options.
3. Develop requirements to assure time, cost and quality control during construction.
4. Assemble bid packages for sub-contractor bidding.
5. Identify bidders and generate bidder interest.
6. Review and analyze bids and recommend awards.
7. Assemble Guaranteed Maximum Price (GMP).
D. Construction Phase
1. Complete construction management services including supervision/administration of construction, review and submission of payment requests, change orders, and other coordination with the construction team, including all subcontractors.
2. Obtain all necessary permits and approvals.
3. Provide complete construction services including labor, materials, and equipment.
4. Maintain an active quality assurance/quality control (QA/QC) program.
5. Maintain staff for construction.
6. Coordination of all onsite activities with the City of Carrollton.
7. Manage schedule, budget, and subcontractor performance.
8. Conduct regular coordination meetings with the City and stakeholders.
E. Post-Construction & Closeout
1. Provide commissioning of all building systems.
2. Deliver as-built drawings, warranties, and operations/maintenance manuals.
3. Conduct staff training for building systems.
4. Complete final punch list and project closeout documentation.
5. 11month warranty insp
| Code | Description |
| 90625 | Design Build, Architectural Services (Inactive, effective January 1, 2016) |
| 90922 | Building Construction, Non-Residential, Office Bldg., etc. |
| 90924 | Building Construction, Commercial and Institutional |
| 90930 | Building Construction, (Not Otherwise Classified) |
Tommy Holland
tholland@carrollton-ga.gov
(770) 830-2000

With GovernmentContracts, you can:
.../Engineering design services, pre-construction consulting services and construction and remodel services... New Construction ...
State Government of Georgia
Bid Due: 11/12/2026
...can be viewed in the Pre-Construction Manager's office at 630 Ronald Reagan Drive, ...
Columbia County
Bid Due: 10/01/2026
...of Transportation (Cobb DOT) Pre-Construction Process and Procedures Manual, and all other applicable ...
Cobb County Transportation
Bid Due: 9/24/2026
...-Construction Process and Procedures Manual, and all other applicable Cobb DOT guidelines. PREQUALIFICATION ...
Cobb County Transportation
Bid Due: 9/24/2026