| Location: | Connecticut |
|---|---|
| Posted: | Mar 7, 2025 |
| Due: | Mar 24, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ECSU 2025-506 |
| Publication URL: | To access bid details, please log in. |
The Project involves the installation of two new air-cooled chillers including hydronic pumps, piping, controls, power wiring and associated site work to accommodate the new equipment. Project includes providing temporary cooling serving Laurel Hall from April 2025 to October 2025 (Entire cooling season of 2025). Removal of existing rooftop air-cooled chiller including associated piping, valves, controls and power wiring and raceway. Installation of (s) new high efficient air-cooled, Mag-Lev chillers outside on grade including associated underground piping, valves, pumps, controls and power wiring. Site Work and layout improvements to accommodate new chiller and related site work. Electrical work to support new HVAC equipment. Installation of new Re-Heat Coil serving existing AHU including duct modifications, piping inline pumps, power wiring and controls located within the attic mechanical room of the building. MANDATORY PREBID CONF 3/12/2025 9am Facilities Conf Room
Heather O'Neil 83 Windham Street Willimantic CT, 06226 United States Tel: 860-465-5000 Fax: oneilh@easternct.edu

With GovernmentContracts, you can:
...on incoming water service, and electrical power to support the equipment including a ...
State Government of Connecticut
Bid Due: 6/23/2026