| Location: | California |
|---|---|
| Posted: | Sep 25, 2025 |
| Due: | Oct 22, 2025 |
| Agency: | City of Lake Forest |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Pickleball Analysis and Court Installation Project (24P05)
Addenda: 0
Release Date: 9/25/2025
Due Date: 10/22/2025
The El Toro Pickleball Court project will replace the existing sand volleyball court with three contiguous concrete pickleball courts and associated improvements. Work includes securing the site, installing erosion control measures, and removing existing sand, turf, irrigation components, and debris while protecting specified trees.
Earthwork will involve grading and compacting the subgrade, followed by placement of a three-inch Class II aggregate base. The court will be constructed with a six-and-a-half-inch Portland Cement Concrete slab, finished with an acrylic Plexipave surface. A four-inch Portland Cement Concrete pedestrian pavement will also be installed.
Fencing will include four-foot perimeter chain link, ten-foot court fencing with privacy screening, and a five-foot-wide by ten-foot-high gate, all with new concrete footings. Pickleball posts and net will be installed per manufacturer specifications.

With GovernmentContracts, you can:
...- General Engineering Contractor, C-12 Earthwork and Paving Contractors Oscar Molina omolina...
City of Turlock
Bid Due: 11/04/2026
...?1/2 General Engineering Contractor, C-12 Earthwork and Paving Contractors Oscar Molina omolina...
City of Turlock
Bid Due: 11/04/2026
...of: culverts, rural roads, various types of fencing, stock ponds, small bridges, earthwork, ...
San Francisco Public Utilities Commission
Bid Due: 11/10/2026
...; Selective Demolition; Earthwork including excavation, placing compacted backfill and aggregate base...
State Government of California
Bid Due: 12/02/2026