| Location: | Washington |
|---|---|
| Posted: | Jul 22, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | Port of Seattle |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | MC-0322591 |
| Publication URL: | To access bid details, please log in. |
| Basic Information | |
| Solicitation Number | MC-0322591 |
| Title | Terminal 25 (T-25) South Habitat Restoration - GC/CM Pre-Construction |
| Status | Open |
| Category | Major Construction |
| Bid Due Date | 08/26/2026 02:00 PM |
| Question Cut-off Date | 08/13/2026 05:00 PM |
| Advertise Date | 07/16/2026 |
| Department | Waterfront Project Management |
| Order of Magnitude | Pre-Construction: $1.5M; MACC $108M |
| Estimate Quarter | 3 |
| Estimate Year | 2026 |
| Port Contact | Gonzalez-Rigatto, Leila |
| Gonzalez-Rigatto.L@portseattle.org | |
| Phone | 206-902-6018 |
This project is a CERCLA cleanup involving removal and disposal of contaminated materials, including in-water sediment, creosote treated timber wharf remnants, and upland soils; and NRD restoration and construction of off-channel emergent marsh, intertidal bench, and riparian environmental habitat area within an approximate 9 acre total project site area.
This GCCM will have a Request for Qualifications (RFQ) and Request for Proposals (RFP).
| Events | ||||
| Title | Start | End | Mandatory | Location |
| Informational Meeting: MC-0322591 – Terminal 25 South Habitat Restoration – GC/CM | 05/19/2026 09:00 AM | 05/19/2026 10:00 AM | No | MS Teams: https://teams.microsoft.com/meet/218990119266430?p=DpJaBgZelmZBA1ktOW |
| Informational Meeting: MC-0322591 – Terminal 25 South Habitat Restoration – GC/CM | 06/23/2026 09:00 AM | 06/23/2026 10:00 AM | No | https://teams.microsoft.com/meet/272290559915980?p=pl999yzIUNCnpzqs6w |
| Pre-Solicitation Meeting | 07/24/2026 11:00 AM | 07/24/2026 12:00 PM | No | MS Teams (Virtual) |
| Public Opening of Final Price Proposal | 12/15/2026 02:30 PM | 12/15/2026 03:00 PM | No | MS Teams (Virtual) |
| Project: | Terminal 25 S Habitat Restoration | ||
|---|---|---|---|
| Project Number: | 105562, 106176, 106407 | Location: | Vicinity of 2917 East Marginal Way South, Seattle, WA 98134 |
PORT OF SEATTLE
ATTACHMENT A - Scope of Work
Attachment A
Scope of Work
Contract # MC-0322591
Project: Terminal 25 S Habitat Restoration
Vicinity of 2917 East Marginal Way
Project Number: 105562, 106176, 106407 Location:
South, Seattle, WA 98134
Background
The Terminal 25 property, located between the East Waterway and East Marginal Way, contains an
active cargo terminal within its approximate northern two thirds, and mixed maritime usage within the
approximate southern third of the property, referred to as T25 South. The eastern half of T25 South is
licensed to the Northwest Seaport Alliance (NWSA) and the western half of the site is managed by the
Port of Seattle (Port). Since the demolition of prior commercial industrial buildings in the 1990's, T25
South has seen a variety of partial uses that currently consist of NWSA leased maritime tenant parking,
public drayage parking, and bulk material storage.
Due to industrial generated contamination, the Port's portion of the T25 South property is part of the East
Waterway Operable Unit within the Harbor Island Superfund site and has been identified as a potential
habitat restoration site within the Port's proposed multi-site habitat mitigation bank program. The habitat
mitigation bank program is a revenue-generating program that restores marginal properties for the
purposes of creating 'mitigation credits' that can be reserved, sold, or serve as a component of a future
settlement agreement to resolve claims related to Natural Resource Damages (NRD).
This GC/CM Preconstruction Service Agreement supports a multi-year T25 South Habitat Restoration
program to provide Preconstruction Support services required for the following two major efforts proposed
within the approximately 9-acre upland and aquatic project site along the shoreline of the East Waterway:
1. An Environmental Protection Agency (EPA) regulated cleanup, per the Comprehensive
Environmental Response, Compensation, and Liability Act (CERCLA), involving the removal and
disposal of on-site contaminated materials primarily consisting of in-water sediment; creosote
treated timber piles and wharf remnants; and upland soils.
2. An NRD restoration of an off-channel environmental area consisting of riparian habitat, marsh,
enhanced intertidal, and shallow subtidal areas that are important for the feeding, rearing, and
providing refuge for juvenile salmon as well as benefiting various other natural animal species. In
addition to the in-water and upland excavation required as part of the contamination cleanup,
construction of the new habitat will involve the import and placement of backfill soils and shoreline
armoring materials; grading to design elevations; erosion and sediment control; and the installation
of plantings and natural shoreline improvements.
Scope of Work Description
Provide preconstruction services in support of project design; scheduling, cost estimating, constructability
consideration, regulatory permitting planning; work packages formulation, and project delivery.
The preconstruction services scope of work (SOW) and the associated level of effort (LOE) are intended
for the completion work necessary for all deliverables through the 100% design milestone per the Port's
current project design authorization. The Port and GCCM Contractor will meet biweekly to review
personnel burn rates and manage the LOE budget.
MC-0322591 / WPs #105562, 106176, 106407 ATTACHMENT A 00 11 01 A-1
Rev. 02/15/2023
| 30% Design Review: | Q1 2027 |
|---|---|
| MACC: | Q2 2028 |
| Construction Begins: | Q1 2029 |
| Construction Complete: | Q3 2031 |
PORT OF SEATTLE
ATTACHMENT A - Scope of Work
Major project elements:
(1) In-water remedial cleanup
a. Removal and disposal of creosote-treated timber piles and structural remnants
b. Sediment materials dredge and disposal
c. Clean material placement
(2) Upland remedial cleanup
a. Pre-existing building foundations excavation and disposal
b. Public drayage parking pavement removal, disposal, and minor hardscape restoration
c. Contaminated soils excavation and disposal
d. TSCA and NAPL area material excavation and disposal
(3) Habitat Restoration
a. Clean backfill materials import and placement
b. Grading to design elevations
c. Installation of shoreline armoring and anchored large wood improvements
d. Installation of riparian and marsh plantings
e. Installation of stormwater improvements between NWSA property and habitat area
Anticipated Task List:
1. Project Management
2. Design and Permitting Support
3. Project Schedule and Phasing
4. SC/CM Selection
5. SC/CM Pre-Construction Services
6. Design and Permitting Support
7. Estimating Services
8. Subcontractor Packaging
9. Site and Existing Conditions Verification
10. Logistics Planning
11. Safety Plan Development
12. Quality Plan Development
Preliminary Schedule
30% Design Review: Q1 2027
MACC: Q2 2028
Construction Begins: Q1 2029
Construction Complete: Q3 2031
End of Section
MC-0322591 / WPs #105562, 106176, 106407 ATTACHMENT A 00 11 01 A-1
Rev. 02/15/2023

With GovernmentContracts, you can:
...CITY OF SUMNER REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES FOR HSIP-000S(668... transportation ...
City of Sumner
Bid Due: 9/18/2026
...:00 PM Advertise Date 08/04/2026 Department Construction Management Order of Magnitude $3M - ...
Port of Seattle
Bid Due: 9/03/2026
..., construction management, inspection, and closeout. The proposed Bradley Road Safety Improvements... and ...
Lynden city
Bid Due: 9/16/2026
...Equipment Maintenance and Repair (Not Otherwise Listed) 958-26-Construction Management Services 150-10...-Construction Services, Hazardous ...
State Government of Washington
Bid Due: 11/20/2026