| Location: | Pennsylvania |
|---|---|
| Posted: | Jan 29, 2026 |
| Due: | Feb 25, 2026 |
| Agency: | County of Allegheny |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ADAR-2025 |
| Publication URL: | To access bid details, please log in. |
Project Description: This work provides for the construction of curb ramps with crosswalks and associated signal modifications on various County roads located within various municipalities. The work includes but is not limited to the design and construction of new curb ramps and new sidewalks, removal of existing sidewalks, asphalt base replacement, traffic signal modifications, placement of topsoil, seeding and soil supplements, standard pavement markings, erosion and sedimentation control, and the maintenance and protection of traffic during construction. View the Proposal, Specifications and Drawings on Bonfire eProcurement’s website https: For questions about logging in and using the Bonfire platform, visit https://customer.eunasolutions.com/public/s/, or call 1-844-226-3862.

With GovernmentContracts, you can:
...erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting...
PennBid
Bid Due: 8/13/2026
...of modified Bio-Retention soil mix, installation of one (1) Bio-Retention Stormwater Control Measure, ...
PennBid
Bid Due: 8/03/2026
...work included soil erosion and sediment control measures, pavement, rock stabilization methods...
PennBid
Bid Due: 8/24/2026
...monomers, chemicals, or contaminants into groundwater, soil, or nearby waterways. • The process...
State Government of Pennsylvania
Bid Due: 7/28/2026