| Location: | North Carolina |
|---|---|
| Posted: | Mar 7, 2025 |
| Due: | Apr 3, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 377-2025-030 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 377-2025-030 |
| Project Title: | IFB 2025-030 Detention Center Sewer Screening |
| Description: | sanitary sewer at the Union County Jail. The sewer screen will discharge to a dumpster via an auger. The dumpster will be located on a new concrete pad sized to accommodate a dumpster pickup truck. The concrete pad will be lined with bollards. A new gravel drive will connect the end of the new concrete pad to the existing gravel drive. Power for the sewer screen equipment will be provided from the nearby evidence storage building. Modifications to the existing railing around the sanitary sewer pit and relocation of electrical equipment for the existing sewage grinder pump will be required. A Non-Mandatory Pre-Bid meeting will be held on March 18, 2025 at 10:00 AM local time at Union County Detention Center, 3344 Presson Rd, Monroe N.C. Attendance at this meeting is strongly encouraged. |
| Opening Date: | 4/3/2025 2:00 PM |
| Posted Date: | 3/8/2025 |
| Status: | Open |
| Department: | COUNTY OF UNION |
|
Solicitation Number
*
377-2025-030
|
Department
COUNTY OF UNION
|
Status Reason
Open
|
|
|
Opening Date
2025-04-03T14:00:00.0000000
|
Posted Date
*
2025-03-07T16:31:11.0000000Z
|
Commodity Code
Sanitary ware
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
sanitary sewer at the Union County Jail. The sewer screen will discharge to a dumpster via an auger. The dumpster will be located on a new concrete pad sized to accommodate a dumpster pickup truck. The concrete pad will be lined with bollards. A new gravel drive will connect the end of the new concrete pad to the existing gravel drive. Power for the sewer screen equipment will be provided from the nearby evidence storage building. Modifications to the existing railing around the sanitary sewer pit and relocation of electrical equipment for the existing sewage grinder pump will be required. A Non-Mandatory Pre-Bid meeting will be held on March 18, 2025 at 10:00 AM local time at Union County Detention Center, 3344 Presson Rd, Monroe N.C. Attendance at this meeting is strongly encouraged.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Type: Rehab Street Name: 1009 Rosada Dr Bid walk time: 6/11/2026 9:30 AM ...
City of Charlotte
Bid Due: 6/18/2026
...Type: Rehab Street Name: 1800 Crawford Bid walk time: 6/17/2026 10:00 AM Bid ...
City of Charlotte
Bid Due: 6/24/2026
...; Foam Insulation WC-12A: Metal Railing System, Misc Metals WC-13: Ext Joint Sealants, ...
North Carolina State University
Bid Due: 7/09/2026
..., loose railings) must be reported to the contractor’s supervisor, who must notify...
Town of Carrboro
Bid Due: 6/12/2026