| Location: | Massachusetts |
|---|---|
| Posted: | Jun 1, 2026 |
| Due: | Jul 15, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The City of Burlington’s Water Resources Division (the “City” or “Owner”) is seeking Statements of Qualifications (SOQ) from qualified General Contractors (GC) to provide pre-construction and general contracting services for the Burlington Main Wastewater Treatment Facility (WWTF) Stage 1 Upgrade using the Construction Manager at Risk (CMAR) method of project delivery. The SOQs will be reviewed, evaluated, and ranked using a qualifications-based selection process, as described in Section 6. The selected CMAR will work with the project team, including the City’s selected engineering consultant (“Engineer”) and Owner’s Advisor, if selected.
For more information and to download the RFQ please go to the City of Burlington’s website: https://www.burlingtonvt.gov/bids.aspx?bidID=121

With GovernmentContracts, you can:
Header Information Bid Number: BD-27-1030-0H100-0H002-132949 Description: 612874 SHREWSBURY-WORCESTER Bridge Preservation, S-14-021=W-44-115, I-290 (EB
Commonwealth of Massachusetts
Bid Due: 10/27/2026
Header Information Bid Number: BD-27-1039-EHS01-ASHWA-133015 Description: 27EHSPMDDSIPMSRFI: RFI for an Incident Prevention Monitoring
Commonwealth of Massachusetts
Bid Due: 10/01/2026
Header Information Bid Number: BD-27-1020-DCRCU-DC250-133000 Description: FY2027 DCR Watershed System Salt Reduction Grant
Commonwealth of Massachusetts
Bid Due: 10/02/2026
Bid Title: Fiber Optic Installation Services for the Town of Wareham Category: 2026
Town of Wareham
Bid Due: 10/08/2026