| Location: | Ohio |
|---|---|
| Posted: | May 21, 2025 |
| Due: | May 27, 2025 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000029216 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000029216 |
| Solicitation Name: | ODOC - Live Fire Training Structure Repairs FY26 |
| Original Begin Date: | 3/26/2025 11:01:23 AM |
| Begin Date: | 5/21/2025 11:53:37 AM |
| End Date: | 5/27/2025 8:00:00 AM |
| Inquiry End Date: | 5/23/2025 5:00:00 PM |
| Commodity: | Building maintenance service |
| MBE Set Aside: | MBE Set Aside |
| Agency: |
COM100000 Administration COMTUSG
COM650000 State Fire Marshal COMSFM |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000029216
|
|||
|
Solicitation Name
ODOC - Live Fire Training Structure Repairs FY26
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
3
|
MBE Set Aside
|
||
|
Begin Date
5/21/2025 11:53:37 AM (ET)
|
Amendment?
|
||
|
End Date
5/27/2025 8:00:00 AM (ET)
|
Inquiry End Date
5/23/2025 5:00:00 PM
|
||
|
Summary
If an additional round is issued for any reason, vendors must resubmit their bid if they had already submitted in a previous round, as the previously submitted Bid Responses do
NOT
carry over to the new round.
OHIO FIRE ACADEMY (OFA) LIVE FIRE TRAINING STRUCTURE
Labor and material to complete required NFPA inspections (Including but not limited to NFPA 1402 & 1403) and maintenance of the OFA live burn facility with System 203 thermal lining system, and fire paver floors for the following broken down below. *Including a general inspection of building / system, that involves removal (and replacement) of tiles for engineering inspection. (Per NFPA) Once required NFPA inspection completed, overall general inspection for; replacement of missing or loose bolt holes, tightening anchors as required, replacement of missing or badly damaged joint packing mix, replacement of 400-500 missing or badly cracked fire pavers and replacement of approx. 25 – 50 thermal lining tiles. If additional work is required, advise of that requirement and submit a proposal to complete same. Original quantity Estimated quantity Tile Maintenance 5000 1500-1600 Replacement Tiles 25-50 Packed Joints 200 Inft 100 -150 Inft Temporary Heat 3-4 days Fire Brick 18000 500 *All in compliance with NFPA Standards, and Ohio Department of Public Safety Division of EMS (excerpt only, below) NFPA 1403, Chapter 7.2 Non-Gas-Fired Live Fire Training Structures and Mobile Enclosed Live Fire Training Props (2018) 7.2.7 The structural integrity of the live fire training structure shall be evaluated and documented by a licensed professional engineer with live fire training structure experience and expertise or by another competent professional as determined by the AHJ at least once every 5 years or more frequently if determined to be required by the evaluator. Please contact david Belcher with any questions or site visit requests. David.Belcher@com.ohio.gov |
|||
|
Process
Itemized Quote.
The quote shall be itemized and include the following: estimated shipping, company name, contact information, including name, phone number and email to which COM should remit the purchase order.
|
|||
|
Ship To
|
|||
1 Record(s)
|
0 Record(s)
|

With GovernmentContracts, you can:
...Department of Public Safety Division of EMS (excerpt only, below) NFPA 1403, Chapter ...
State Government of Ohio
Bid Due: 6/16/2026