| Location: | Florida |
|---|---|
| Posted: | Oct 5, 2026 |
| Due: | Oct 28, 2026 |
| Agency: | Okaloosa County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB AP 03-27 |
| Publication URL: | To access bid details, please log in. |
Project ID: ITB AP 03-27
Title: Replace Passenger Boarding Bridges Pre-Conditioned Air and Ground Power Units at VPS
Addenda: 0
Release Date: 10/5/2026
Due Date: 10/28/2026
This Invitation to Bid seeks qualified bidders to furnish and install up to three (3) 45-ton Preconditioned Air Units (PCA) and two (2) 90 KVA w/28VDC Ground Power Units (GPU) on existing passenger boarding bridges at Destin-Fort Walton Beach Airport (VPS). The work will require the successful bidder to monitor project coordination with a licensed general contractor, obtain field verification for all planning elements, equipment installation and fabrication requirements, system start-up, functional testing, commissioning, and turnover, including training on the equipment for onsite maintenance provider. All welding must be performed by a certified welder.

With GovernmentContracts, you can:
...and Commissioning Services Secondary Contact Number 0562FAC-RFQ Tertiary Contact Type Request... and Commissioning ...
Hillsborough County Public Schools
Bid Due: 11/06/2026
...FSU InSPIRE Climatic Wind Tunnel * The design, fabrication, delivery, installation, commissioning...
Florida State University
Bid Due: 3/01/2027
..., testing, and commissioning in accordance with JEA standards and project specifications. USE ...
JEA
Bid Due: 12/01/2026
..., installation, testing, commissioning, and operator training in accordance with the specifications outlined...
City of Tallahassee
Bid Due: 11/17/2026