| Location: | Georgia |
|---|---|
| Posted: | Jan 17, 2025 |
| Due: | Feb 14, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66206-NONST-2025-000000008 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66206-NONST-2025-000000008 | DOWNTOWN BEAUTIFICATION/INFRASCTURE PROJECT | Baxley, City Of |
Jan 17, 2025 @ 11:06 AM
|
Feb 14, 2025 @ 11:00 AM
|
Start Date: Jan 17, 2025 @ 11:06 AM ET
End Date:
Feb 14, 2025 @ 11:00 AM ET
The City of Baxley, Georgia, seeks qualified engineering firms to prepare a Preliminary Engineering Report (PER) for a Downtown Beautification/Infrastructure Project. This initiative aims to enhance the stormwater system and revitalize the downtown area with improved streetscapes, green spaces, public art, lighting, and street furniture, creating a vibrant, welcoming space that encourages community engagement and economic growth.
The selected firm will assess existing conditions, propose sustainable designs, provide cost estimates, and develop a phased implementation plan. Proposals are due by February 14, 2025, and must include the firm¿s qualifications, project approach, schedule, and cost estimate.
For details, contact Keri Orvin, City Manager, at (912) 367-8300 or manager@baxley.org. Proposals can be mailed to City of Baxley, Attn: City Manager's Office, P.O. Box 290, Baxley, GA 31515, or submitted via email.
| Code | Description |
| 90656 | Landscape, Architectural Services |
| 90657 | Land Development and Planning, Architectural Services |
| 90654 | Irrigation; Drainage; Flood Control, Architectural Services |
| 92517 | Civil Engineering |
| 92528 | Drainage Engineering |
| 92535 | Environmental Engineering |
| 92536 | Engineering Services (Not Otherwise Classified) |
| 92537 | Facilities Design Engineering |
| 92544 | General Construction: Management, Scheduling, Cost Estimation Engineering |
| 92549 | Highways, Streets, Airport Pay-Parking Lots Engineering |
| 92558 | Irrigation; Drainage; Flood Control Engineering |
| 92561 | Land Development and Planning Engineering |
| 92570 | Municipal Engineering |
| 92593 | Traffic and Transportation Engineering |
Keri Orvin
manager@baxley.org
912 367 8300

With GovernmentContracts, you can:
...Construction, Sustainable, Green 90954 Home Construction, Single Family 90975 Site Clean-up, Post...
State Government of Georgia
Bid Due: 6/12/2026
...by jwilliams5 Purpose This project will create a walkable, livable, sustainable and beautiful ...
Macon Bibb County
Bid Due: 6/18/2026
...for sustainable facility development and long-term management. The City's expectation is that the ...
State Government of Georgia
Bid Due: 6/26/2026
..., livable, sustainable and beautiful urban core for Pleasant Hill employing a process ...
State Government of Georgia
Bid Due: 6/18/2026