| Location: | Washington |
|---|---|
| Posted: | Jul 10, 2025 |
| Due: | Jul 16, 2025 |
| Agency: | County of Clark |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2782 |
| Publication URL: | To access bid details, please log in. |
The project consists of the supply and installation of utilities for an existing concrete RV pad. Utilities include a combo septic tank based on attached septic design plans, potable water and electrical service. See Plan below for detailed information. Work will also include site clean-up and turf restoration.
Addendum 1 - Issued Wednesday, July 2, 2025
A Pre- Bid Meeting is scheduled for Tuesday, July 1, 2025 at 10:00 am. Contractors shall meet in the parking area of the South restroom structure at Frenchman’s Bar Regional Park located at 9612 NW Lower River Road, Vancouver WA 98660.

With GovernmentContracts, you can:
...scope would include the design and installation of a dry system. The work ...
Port of Seattle
Bid Due: 10/01/2026
...Follow HEALY-SLEP Industry Day - Deaerating Feed Tank (DFT), PLC-Based Steering Control System... ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 10/06/2027
...generation along with a 12,500-gallon propane storage tank, and installation of approximately 11...
DEPT OF DEFENSE
Bid Due: 9/29/2026