Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services

Location: Florida
Posted: Sep 10, 2026
Due: Sep 25, 2026
Agency: City of Lakeland
Type of Government: State & Local
Category:
  • 49 - Maintenance and Repair Shop Equipment
  • 72 - Household and Commercial Furnishings and Appliances
  • Q - Medical Services
  • S - Utilities and Training Services
Publication URL: To access bid details, please log in.


Project ID:

Title: Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services

Addenda: 0

Release Date: 9/10/2026

Due Date: 9/25/2026

Follow
Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services
Request For Proposal
LE - Production - MPP
238 , 238220 , 811310
Project ID: 2026-RFP-114
Release Date: Thursday, September 10, 2026
· Due Date: Friday, September 25, 2026 2:00pm
Posted Thursday, September 10, 2026 5:46pm
All dates & times in Eastern Time - New York
Draft Response No Bid14 days, 16 hours, 29 minutes


Post Information

Posted At:Thu, Sep 10, 2026 5:46 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

Lakeland Electric (OWNER) seeks well-qualified and experienced Boiler and HRSG contractors to perform various scopes of work as detailed below. The work will take place during the Unit No. 5 Fall Outage, beginning on November 29, 2026, and ending on December 19, 2026.

This solicitation is a Request for Proposal (RFP) in which the Bidder will provide detailed accounts of their experience as an industrial boiler contractor capable of performing code welds on thin-wall HRSG tubes and heavy wall P91 piping, as well as providing other measurable & verifiable criteria to be detailed in the sections below.



Background

The HRSG at McIntosh Unit 5 uses waste heat from a Siemens 501G combustion turbine to produce superheated, dry steam and supply that steam to a Siemens steam turbine. The HRSG is a Nooter-Erikson steam generator, commissioned in the year 2000. It is designed to produce 553,360 lbs/hr main-steam flow at 1,832 psig and 1041°F at the HP superheat outlet. The HRSG is a three-pressure system with a low-pressure (LP) drum, and intermediate pressure (IP) drum and a high pressure (HP) drum. Siemens performed a "Flex Fire" upgrade on the 501G CT in 2020, increasing mass flow and exhaust temperature through the HRSG.

Recent borescope inspections have revealed indications in one of the Reheat desuperheater spray liner. The replacement spool is on-hand.

A portion of the Outage work will be performed on a Time and Materials basis and will be determined by inspection findings during the outage.



Timeline

RFP release:
September 10, 2026
RFP questions deadline:
September 15, 2026, 2:00pm
City responses to vendors:
September 17, 2026, 2:00pm
RFP proposal due date:
September 25, 2026, 2:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Event: Medical Director Services Event: 185-0 Reference: RFP 2026-026 Category: Sub Category: Type:

City of Coral Gables

Bid Due: 9/30/2026

Title Start Date End Date Status RFP No. 26-34-26101 POLICE PROMOTIONAL ASSESSEMENT TESTING

Jacksonville International Airport

Bid Due: 9/29/2026

Project ID: RFB 27-001 Title: Tire Supply and Roadside Services Addenda: 0 Release

City of Clermont

Bid Due: 10/15/2026

Project: Passenger Loading Bridge Replacement Ref. #: RFSQ-112-26-RR Department: AVIATION Type: RFSQ Status:

City of Tallahassee

Bid Due: 10/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.