| Sheet No. | Revision |
|---|---|
| 3D-1 (Part 1) | Updated Totals and Combined Project Totals - Quantities shown below. |
| 3D-2 (Part 1) | Revised label for "Combined Project W03293 Totals". |
| 6 (Part 1) | Revised note for DS-600. |
| 3D-2 (Part 2) | Revised quantities - shown below. |
| 12 (Part 2) | Revised - removed "grade to drain" note. |
| Sheet No. | Revision |
|---|---|
| W-5 (Part 1), W-7 (Part 1), W-7 (Part 2), W-9 (Part 2), W-13 (Part 2), W-17 (Part 2) | Revised call-out to read "MICROPILE GRADE BEAM, CAST-IN-PLACE CONCRETE" |
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN DANIEL H. JOHNSON
GOVERNOR SECRETARY
March 17, 2026
Addendum No. 2
RE: Contract # C205165
WBS # 18314.1075015, etc.
FEDERAL-AID NO. HELENE
Polk County
SITES 936-940, 942-944, 314, 316-321, 941: US-176 FROM 0.1 M N OF
THOMPSON RD TO 0.8 M EAST OF BEAR CREEK LN. W03293
March 17, 2026 Letting
To Whom It May Concern:
Reference is made to the plans furnished to you on this project.
The following revisions have been made to the Roadway plans.
Sheet No. Revision
Updated Totals and Combined Project Totals - Quantities
3D-1 (Part 1)
shown below.
3D-2 (Part 1) Revised label for "Combined Project W03293 Totals".
6 (Part 1) Revised note for DS-600.
3D-2 (Part 2) Revised quantities - shown below.
12 (Part 2) Revised - removed "grade to drain" note.
Please void the above listed Sheets in your Plans and staple the revised Sheets thereto.
The following revisions have been made to the Wall plans.
Sheet No. Revision
W-5 (Part 1), W-7 (Part
1), W-7 (Part 2), W-9 Revised call-out to read "MICROPILE GRADE BEAM,
(Part 2), W-13 (Part 2), CAST-IN-PLACE CONCRETE"
W-17 (Part 2)
Please void the above listed Sheets in your Plans and staple the revised Sheets thereto.
Mailing Address: Telephone: (919) 707-6900 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 250-4127 1020 BIRCH RIDGE DR.
CONTRACT STANDARDS AND DEVELOPMENT Customer Service: 1-877-368-4968 RALEIGH, NC 27610
1591 MAIL SERVICE CENTER
RALEIGH, NC 27699-1591
Website: www.ncdot.gov
| Page No. | Revision |
|---|---|
| Proposal Cover | Note added that reads "Includes Addendum No. 2 Dated 03-17-2026". |
| G-2 | The PROJECT SPECIAL PROVISION entitled CONTRACT TIME AND LIQUIDATED DAMAGES has been revised. The PROJECT SPECIAL PROVISION entitled INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES has been revised. |
| G-5 | The PROJECT SPECIAL PROVISION entitled SPECIALTY ITEMS has been revised. |
| G-18 | The PROJECT SPECIAL PROVISION entitled SCHEDULE OF ESTIMATED COMPLETION PROGRESS has been revised. |
| GT-2.1 through GT-2.9 | The UNIT PROJECT SPECIAL PROVISION entitled MICROPILE GRADE BEAM has been revised. |
| GT-3.1 through GT-3.2 | The UNIT PROJECT SPECIAL PROVISION entitled ROCK EMBANKMENTS has been revised. |
C205165 Polk County
The following revisions have been made to the proposal.
Page No. Revision
Note added that reads
Proposal Cover
"Includes Addendum No. 2 Dated 03-17-2026".
The PROJECT SPECIAL PROVISION entitled
CONTRACT TIME AND LIQUIDATED DAMAGES
has been revised. The PROJECT SPECIAL PROVISION
G-2
entitled INTERMEDIATE CONTRACT TIME
NUMBER 1 AND LIQUIDATED DAMAGES has been
revised.
The PROJECT SPECIAL PROVISION entitled
G-5
SPECIALTY ITEMS has been revised.
The PROJECT SPECIAL PROVISION entitled
G-18 SCHEDULE OF ESTIMATED COMPLETION
PROGRESS has been revised.
The UNIT PROJECT SPECIAL PROVISION entitled
GT-2.1 through GT-2.9
MICROPILE GRADE BEAM has been revised.
The UNIT PROJECT SPECIAL PROVISION entitled
GT-3.1 through GT-3.2
ROCK EMBANKMENTS has been revised.
Please void the above listed pages in your proposal and staple the revised Sheets thereto.
On the item sheets the following pay item revisions have been made:
Item Description Old Quantity New Quantity
0057- 2286000000-N MASONRY DRAINAGE 23 EA 21 EA
840 STRUCTURES
0058-2297000000-E MASONRY DRAINAGE NEW ITEM 12.1 CY
840 STRUCTURES
0059- 2308000000-E MASONRY DRAINAGE 12.8 LF 8.2 LF
840 STRUCTURES
*PLEASE NOTE SOME PAY ITEMS HAVE BEEN RE-NUMBERED AS A RESULT
OF A NEW PAY ITEM BEING ADDED IN THIS ADDENDUM*
The Contractor's bid must include these pay item revisions.
The electronic bidding file has been updated to reflect these revisions. Please download
the Addendum File and follow the instructions for applying the addendum. Bid Express
will not accept your bid unless the addendum has been applied.
C205165 Polk County
The contract will be prepared accordingly.
Sincerely,
Ronald E. Davenport, Jr., PE
State Contract Officer
RED/jcm
Attachments
cc: Mr. Wiley W. Jones III, PE Mr. Forrest Dungan, PE
Mr. Wesley T. Grindstaff, PE Ms. Jaci Kincaid
Mr. Ken Kennedy, PE Mr. Jon Weathersbee, PE
Mr. Malcolm Bell Project File (2)
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH, N.C.
PROPOSAL
INCLUDES ADDENDUM No. 2 DATED 03-17-2026
Mar 24, 2026 AT 02:00 PM
DATE AND TIME OF BID OPENING:
CONTRACT ID C205165
WBS 18314.1075015, 18314.1075016, 18314.1075017, 18314.1075018,
18314.1075019, 18314.1075020, 18314.1075021, 18314.1075022,
18314.1075023, 18314.1075025, 18314.1075026, 18314.1075027,
18314.1075028, 18314.1075029, 18314.1075030, 18314.1075035
FEDERAL-AID NO. HELENE
COUNTY POLK
T.I.P NO.
MILES 1.221
ROUTE NO. US-176
LOCATION SITES 936-940, 942-944, 314, 316-321, 941: US-176 FROM 0.1 M N OF
THOMPSON RD TO 0.8 M EAST OF BEAR CREEK LN. W03293
TYPE OF WORK GRADING, DRAINAGE, PAVING, AND RETAINING WALLS.
NOTICE:
ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE OF GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
GENERAL STATUTES OF NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING BOARD FOR CONTRACTORS WHEN BIDDING
ON ANY NON-FEDERAL AID PROJECT WHERE THE BID IS $30,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY THE LICENSING BOARD.
BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR CONDITIONING
AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS
ON BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH
CAROLINA FOR LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
BIDS WILL BE RECEIVED AS SHOWN BELOW:
THIS IS A ROADWAY & STRUCTURE PROPOSAL
5% BID BOND OR BID DEPOSIT REQUIRED
C205165 18314.1075015, etc. G-2 Polk County
manufacturer or supplier. The Engineer will retain documentation for audit or inspection
purposes.
CONTRACT TIME AND LIQUIDATED DAMAGES:
(8-15-00) (Rev. 5-16-23) 108 SP1 G08 A
The date of availability for this contract is May 4, 2026 for Sites 314, 318, 320, 938, and 943,
except May 29, 2026 for the remainder of the project, except that work in jurisdictional
waters and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and
the Contractor is held as stipulated in the permits contained elsewhere in this proposal. This
delay in availability has been considered in determining the contract time for this project.
The completion date for this contract is December 27, 2029.
Except where otherwise provided by the contract, observation periods required by the contract
will not be a part of the work to be completed by the completion date and/or intermediate
contract times stated in the contract. The acceptable completion of the observation periods that
extend beyond the final completion date shall be a part of the work covered by the performance
and payment bonds.
The liquidated damages for this contract are Two Hundred Dollars ($ 200.00) per calendar day.
These liquidated damages will not be cumulative with any liquidated damages which may
become chargeable under Intermediate Contract Time Number 1.
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:
(7-1-95) (Rev. 2-21-12) 108 SP1 G13 A
Except for that work required under the Project Special Provisions entitled Planting,
Reforestation and/or Permanent Vegetation Establishment, included elsewhere in this proposal,
the Contractor will be required to complete all work included in this contract and shall place and
maintain traffic on same.
The date of availability for this intermediate contract time is May 4, 2026 for Sites 314, 318,
320, 938, and 943, except May 29, 2026 for the remainder of the project,
The completion date for this intermediate contract time is June 30, 2029.
The liquidated damages for this intermediate contract time are Three Thousand Seven
Hundred Dollars ($ 3,700.00) per calendar day.
Upon apparent completion of all the work required to be completed by this intermediate date, a
final inspection will be held in accordance with Article 105-17 and upon acceptance, the
Department will assume responsibility for the maintenance of all work except Planting,
Reforestation and/or Permanent Vegetation Establishment. The Contractor will be responsible
for and shall make corrections of all damages to the completed roadway caused by his planting
operations, whether occurring prior to or after placing traffic through the project.
C205165 18314.1075015, etc. G-5 Polk County
SPECIALTY ITEMS:
(7-1-95)(Rev. 1-16-24) 108-6 SP1 G37
Items listed below will be the specialty items for this contract (see Article 108-6 of the
Standard Specifications).
Line # Description
65-68 Guardrail
71-77 Signing
94 Long-Life Pavement Markings
95 Removable Tape
100 Permanent Pavement Markers
101 Utility Construction
102-130, 132-134 Erosion Control
131 Reforestation
FUEL PRICE ADJUSTMENT:
(11-15-05)(Rev. 1-16-24) 109-8 SP1 G43
Page 1-82, Article 109-8, FUEL PRICE ADJUSTMENTS, add the following:
The base index price for DIESEL #2 FUEL is $ 2.4622 per gallon. Where any of the following
are included as pay items in the contract, they will be eligible for fuel price adjustment.
| 2026 | (7/01/25 - 6/30/26) | 10% of Total Amount Bid |
|---|---|---|
| 2027 | (7/01/26 - 6/30/27) | 36% of Total Amount Bid |
| 2028 | (7/01/27 - 6/30/28) | 33% of Total Amount Bid |
| 2029 | (7/01/28 - 6/30/29) | 21% of Total Amount Bid |
C205165 18314.1075015, etc. G-18 Polk County
SCHEDULE OF ESTIMATED COMPLETION PROGRESS:
(7-15-08)(Rev. 6-17-25) 108-2 SP1 G58
The Contractor's attention is directed to the Standard Special Provision entitled Availability of
Funds Termination of Contracts included elsewhere in this proposal. The Department of
Transportation's schedule of estimated completion progress for this project as required by that
Standard Special Provision is as follows:
Fiscal Year Progress (% of Dollar Value)
2026 (7/01/25 - 6/30/26) 10% of Total Amount Bid
2027 (7/01/26 - 6/30/27) 36% of Total Amount Bid
2028 (7/01/27 - 6/30/28) 33% of Total Amount Bid
2029 (7/01/28 - 6/30/29) 21% of Total Amount Bid
The Contractor shall also furnish his own progress schedule in accordance with Article 108-2 of
the Standard Specifications. Any acceleration of the progress as shown by the Contractor's
progress schedule over the progress as shown above shall be subject to the approval of the
Engineer.
DISADVANTAGED BUSINESS ENTERPRISE:
(10-16-07)(Rev. 10-21-25) 102-15(J) SP1 G61
Description
The purpose of this Special Provision is to carry out the U.S. Department of Transportation's
policy of ensuring nondiscrimination in the award and administration of contracts financed in
whole or in part with Federal funds. This provision is guided by 49 CFR Part 26.
Definitions
Additional DBE Subcontractors - Any DBE submitted at the time of bid that will not be used to
meet the DBE goal. No submittal of a Letter of Intent is required.
Committed DBE Subcontractor - Any DBE submitted at the time of bid that is being used to
meet the DBE goal by submission of a Letter of Intent. Or any DBE used as a replacement for
a previously committed DBE firm.
Contract Goal Requirement - The approved DBE participation at time of award, but not greater
than the advertised contract goal.
DBE Goal - A portion of the total contract, expressed as a percentage, that is to be performed by
committed DBE subcontractor(s).
Disadvantaged Business Enterprise (DBE) - A firm certified as a Disadvantaged Business
Enterprise through the North Carolina Unified Certification Program.
Goal Confirmation Letter - Written documentation from the Department to the bidder confirming
the Contractor's approved, committed DBE participation along with a listing of the committed
DBE firms.
GT-2.1
W03293 PolkCounty
MICROPILE GRADE BEAM (SPECIAL)
1.0 GENERAL
This project includes construction of an array of micropiles connected to a grade beam, knee
wall, footing, or leveling course, which serve to stabilize existing or potential slope instability
and support future wall construction or roadway widening. A micropile is a small diameter,
drilled and grouted non-displacement pile. Micropiles are designed and constructed with
reinforcing casing and typically a center reinforcing bar. Design and construct micropiles
with the required capacity in accordance with the contract and accepted submittals. Use a
prequalified Micropile Subcontractor for micropile work. Define "pile" as a micropile and
"footing" as a micropile grade beam, knee wall, footing, or leveling course.
2.0 MATERIALS
Refer to the Standard Specifications.
Item Section
Reinforcing Steel 1070
Portland Cement Concrete, Class A 1000
Steel casings may be new "Structural Grade" steel pipe free from dents, cracks, cuts or any
other defects. All steel for micropiles shall meet the requirements of Article 106-1 of the
Standard Specifications.
Provide a Type 1 material certification that meets Article 106-3 of the Standard
Specifications for reinforcing casings and bars. Store steel reinforcement on blocking at least
12" above the ground and protect it at all times from damage; and when placing in the work
make sure it is free from dirt, dust, loose mill scale, loose rust, paint, oil or other foreign
materials.
For testing yield strength, define a "lot" as each truckload delivered and 2 samples and tests
are required per lot. Use steel casings with the minimum wall thickness shown in the plans
and outside diameters ranging from the minimum shown in the plans to 3" larger. Provide
casings meeting the tensile requirements of ASTM A252, Grade 3, except with an elongation
of at least 15% and yield strength of at least 50 ksi (343 MPa) unless noted otherwise in the
plans.
Use deformed steel bars that meet AASHTO M 275 or M31, Grade 60 or 75. Splice
reinforcing bars in accordance with Article 1070-9 of the Standard Specifications. Hollow
self-drilling bars shall meet ASTM A519 or A513 with minimum yield strengths of 100 ksi
and 87 ksi, respectively, and shall be oversized to account for up to 1/8-inch reduction in
diameter due to corrosion. Locate reinforcing casing joints at least 2 ft from bar splices.
Fabricate bar centralizers from schedule 40 PVC plastic pipe or tube, steel or other material
not detrimental to steel reinforcement (no wood). Size centralizers to position reinforcement
within 1" of drill hole centers and allow tremies to be inserted to ends of holes. Use
centralizers that do not interfere with grout placement or flow around reinforcement.
GT-2.2
W03293 PolkCounty
Use Class A concrete for cast-in-place concrete footing that meets Article 450-2 of the
Standard Specifications.
Provide micropile head assemblies consisting of nuts, washers and bearing plates. Use steel
bearing plates that meet ASTM A36 and steel washers and hex nuts recommended by the
Bar Manufacturer.
3.0 PRECONSTRUCTION REQUIREMENTS
Two submittals are required. These submittals include (1) micropile design and (2) micropile
installation and testing plan. Provide a PDF copy of each submittal. Submit the submittals
at least 30 days before starting micropile construction. Do not begin micropile construction
until the installation and testing plan is accepted.
A Design Engineer is required to design the micropiles. Submit documentation that the
Design Engineer is licensed by the State of North Carolina and has at least 5 years of
experience in designing micropiles for footing and in subsurface conditions similar to those
for this project. Documentation should include resumes, references, certifications, project
lists, experience descriptions and details, etc.
A. Micropile Footing Design Submittal
A conceptual micropile arrangement is shown in the plans. Review and verify existing site
and subsurface conditions and survey information before designing micropiles.
Design the micropile footing in accordance with the FHWA NHI-05-039 Micropile Design
and Construction, Chapter 6. Define "bond length" as the micropile center bar length below
the reinforcing casing tip elevation, the reinforcing casing tip elevation if a center bar does
not extend below the casing, or the micropile length in weathered rock or rock when only a
bar is used for the micropile. Perform a slope stability analysis using the soil parameters and
the assumed design failure plane shown in the plans. Determine the required bond length and
micropile reinforcement to provide a global factor of safety equal to 1.35. A bond length of
at least 10 ft into weathered rock or rock is required. Use a bond length factor of safety equal
to 2.0 for axial compression and uplift resistance. Evaluate the shear and bending moment
capacity of the cased and uncased sections in the unsupported length and casing joint portions
of the micropiles.
Design micropile footings with the minimum dimensions shown on the plans. Reinforce
micropile footings to resist the loading from the micropiles and slope instability.
When the micropile footing is utilized to provide bearing support of a retaining wall system,
design the micropiles and micropile footing to resist the vertical and horizontal retaining wall
loads.
When the micropile footing is used in conjunction with additional geotechnical systems such
as anchored soldier pile walls, permanent soil nail walls, and permanent soil nail shoring in
Shored MSE or GRS Retaining Walls, the benefit of all of the stabilization systems may be
combined to provide a minimum factor of safety of 1.35. The global stability benefit of a
GT-2.3
W03293 PolkCounty
MSE or GRS retaining wall shall not be considered.
Submit working drawings, slope stability analyses, and design calculations including
estimated unit ultimate capacities for acceptance in accordance with Article 105-2 of the
Standard Specifications. Include all dimensions, quantities, elevations and cross-sections
necessary to construct the micropile footing. Have piles designed, detailed and sealed by the
Design Engineer. When design changes occur due to load test results, varying site conditions
or other reasons, a revised design submittal is required.
B. Micropile Installation and Testing Plan Submittal
Provide detailed project specific information in the installation and testing plan that includes
the following:
1. List and sizes of proposed equipment including micropile drilling rigs and tools,
tremies and grouting equipment;
2. Sequence of micropile construction and step-by-step description of micropile
installation including details of casing installation, drilling methods and flushing;
3. List of reinforcement and casings including grades or yield strength and sizes;
4. Methods for placing reinforcement with procedures for supporting and positioning
the reinforcement including centralizers;
5. Procedures for placing grout including how the grout will be initially placed in drill
holes and acceptable ranges for grout pressures and volumes;
6. Equipment and procedures for monitoring and recording grout levels, pressures and
volumes with calibration certificates dated within 90 days of the submittal date;
7. Examples of construction records to be provided that meet Section 8.0 of this
provision;
8. Procedures for containment and disposal of drilling spoils, drill flush and waste
grout;
9. Approved packaged grout or grout mix design with acceptable ranges for flow and
density that meets Section 1003 of the Standard Specifications;
10. If load testing is required, load testing details, procedures and plan sealed by the
Design Engineer or Project Engineer for the Load Test Supplier with calibration
certificates dated within 90 days of the submittal date;
11. Load Test Supplier, when applicable, including Project Engineer; and
12. Other information shown in the plans or requested by the Engineer.
If alternate installation and testing procedures are proposed or necessary, a revised
installation and testing plan submittal may be required. If the work deviates from the
accepted submittal without prior approval, the Engineer may suspend micropile construction
until a revised plan is accepted.
C. Preconstruction Meeting

With GovernmentContracts, you can:
Follow Multiple Building Fire Exhaust Systems Repairs Active Contract Opportunity Notice ID N4008526R9059
DEPT OF DEFENSE
Bid Due: 8/05/2026
Follow 43d Air Mobility Squadron_ Request for Proposal_FA445226R0012_B753 Kitchen Renovation Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 8/05/2026
Follow Multiple Base-wide Location Fencing Repairs Active Contract Opportunity Notice ID N4008524R9072 Related
DEPT OF DEFENSE
Bid Due: 8/20/2026
Project: Federal Pipe Video Contracts Ref. #: 269- 2026-235 Department: City Procurement Type:
City of Charlotte
Bid Due: 8/24/2026