| Location: | California |
|---|---|
| Posted: | Mar 17, 2026 |
| Due: | Apr 9, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
North 99 Frontage Road East Resurfacing 2026
The work is located northeast of Stockton on the east side of State Route 99 and south of Hammer Lane.
The work, in general, consists of repairing and resurfacing approximately 0.8 mile of roadway with asphalt concrete. Base Estimate Range between $452,000 and $553,000 |
04/09/2026 08:31 PM UTC |

With GovernmentContracts, you can:
...Contact: Eric van Leeuwen E-Mail 19-745-016 PLANT MIX ASPHALT CONCRETE - EAST SLOPE ...
El Dorado County
Bid Due: 9/14/2028
...Basic Information Title Hot mix asphalt (Type A), culvert work, and minor concrete. ...
State Government of California
Bid Due: 10/22/2026
...(PAI) sites. The scope of work includes sidewalk, driveway, curb, and gutter replacement; ...
City of Los Angeles
Bid Due: 10/14/2026
...Description: Demolish and remove the existing exterior weight room structure, concrete/asphalt, fencing...
Corona-Norco (California) Unified School District
Bid Due: 9/28/2026