| Location: | California |
|---|---|
| Posted: | Mar 17, 2026 |
| Due: | Apr 9, 2026 |
| Agency: | County of San Joaquin |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
North 99 Frontage Road East Resurfacing 2026
The work is located northeast of Stockton on the east side of State Route 99 and south of Hammer Lane.
The work, in general, consists of repairing and resurfacing approximately 0.8 mile of roadway with asphalt concrete. Base Estimate Range between $452,000 and $553,000 |
04/09/2026 08:31 PM UTC |

With GovernmentContracts, you can:
...Contact: Eric van Leeuwen E-Mail 19-745-016 PLANT MIX ASPHALT CONCRETE - EAST SLOPE ...
El Dorado County
Bid Due: 9/14/2028
...of roadway with asphalt concrete. Base Estimate Range between $394,900 and $482,000 06/18/2026 ...
County of San Joaquin
Bid Due: 6/18/2026
...rubberized cape seal, repairing, and resurfacing approximately 4.4 miles of roadway with asphalt ...
County of San Joaquin
Bid Due: 6/25/2026
..., in general, consists of repairing and resurfacing approximately 4.40 miles of roadway ...
County of San Joaquin
Bid Due: 6/18/2026