| Location: | Federal |
|---|---|
| Posted: | May 23, 2025 |
| Due: | May 19, 2025 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 5-B191-P-00160-00 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The objective of this requirement for a study is to estimate the design and cost of setting up and operating a large- scale plant in the United States to produce LIB using LFP and LFMP cathode active materials. Estimates for three plant sizes should be provided for 5, 25, and 50 GWh per year capacity plants. This work is expected to provide Argonne with a design of the physical and chemical processing steps necessary in the production of cells using LFP and LMFP cathode materials.
| Apr 29, 2025 | [Solicitation (Original)] Estimating the Cost of a Manufacturing Plant for LFP-Based Lithium-Ion Cells |
| May 8, 2025 | [Solicitation (Updated)] Estimating the Cost of a Manufacturing Plant for LFP-Based Lithium-Ion Cells |

With GovernmentContracts, you can:
...Follow 6135-01-513-1499 CWOD Battery, Lithium MK132 Mod 1 Active Contract Opportunity Notice ID... ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...Follow 6135-01-513-1499 CWOD Battery, Lithium MK132 Mod 1 Active Contract Opportunity Notice ID... ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...and lithium ion hybrid capacitor electrodes Lithium sulfur battery electrodes Zinc iodine battery...
ENERGY, DEPARTMENT OF
Bid Due: 7/06/2026