| Location: | Texas |
|---|---|
| Posted: | Jul 11, 2025 |
| Due: | Aug 6, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB2025-052 |
| Publication URL: | To access bid details, please log in. |
RFB2025-052
Posted
Melanie Wade
(254) 750-8098
melaniew@wacotx.gov
8/6/2025
2:00 PM
M1612
21+ Days for Solicitation Notice
7/11/2025
7/11/2025 2:05 am
90974-Site Clean;
90975-Site Clean-Up, Post-Construction;
91027-Garbage and Trash Removal, Disposal and or Treatment Services;
91223-Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.);
91238-Construction Services, Hazardous Waste (Incl. Site Management);
The City of Waco has issued this solicitation for debris removal at Lake Brazos Dam, a minimum of once per year and maximum two (2) times per year at times to be determined by the City of Waco. Debris is defined as (mostly) logs, but the City wants anything that’s built up in front of the dam (upstream side) to be removed or relocated whether it’s plastic, tires, a boat, etc. Logs, silt and organic matter will be placed on the downstream side of the dam. Trash will have to be collected and contained. The City will provide a roll off at the City’s expense for the nonorganic (trash) items. This Contractor will be responsible for all labor, materials, and equipment required for removing debris upstream of Lake Brazos Dam and the placement of organic material on the downstream side of the dam and non-organic material in the roll off dumpster provided by the city.

With GovernmentContracts, you can:
...Project: PW CSP - C01239 - Mary's Creek Water Reclamation Facility Ref. #: ...
City of Fort Worth
Bid Due: 6/25/2026
...-gallon intermediate bulk containers (totes) to Austin Water Waste Treatment Plants. Basic Information...
City of Austin
Bid Due: 6/09/2026
...production and disposal of the treatment facility waste stream (if routing of treatment ...
City of Portland
Bid Due: 7/09/2026