| Location: | Vermont |
|---|---|
| Posted: | Jul 10, 2025 |
| Due: | Jul 29, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Orleans Keywords: Construction (Non Building) Bid Description: The Sleeper Pond Dam on Mudd Creek will be removed. Project construction is anticipated between August 1, 2025 and October 1, 2025. Instream work periods will limit timing of portions of the work. Work tasks will generally involve removal of the concrete dam (~100 CY) and associated remains; sediment removal and haul from river and floodplain (~8,000 CY); invasive species handling; stream channel restoration using onsite bed materials; installation of beaver dam analogs and post assisted log structures; replacement and possible encasement of water main; installation of boulder revetments and dry stacked boulder wall; and site restoration. Email Jessica Louisos for plans
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Owner's Rep/Construction Manager Request Date: 7/16/2026 9:48:24 AM Open Date: 7/16/2026 Closing...: Consultant ...
State Government of Vermont
Bid Due: 8/10/2026
...Kennedy Drive Pond 7 Stormwater Improvements Construction Request Date: 7/22/2026 2:54:49 PM Open... ...
State Government of Vermont
Bid Due: 8/28/2026
...Lake Forest Condos Stormwater Improvement Project Construction Request Date: 7/15/2026 10:52:16 AM... Winooski ...
State Government of Vermont
Bid Due: 8/07/2026
...Keywords: Bridge Repair and Construction, Road Construction Bid Description: Replacement of Bridge No.../contract-admin/bids-requests/construction-contracting ...
State Government of Vermont
Bid Due: 8/21/2026