| Location: | Missouri |
|---|---|
| Posted: | Aug 29, 2025 |
| Due: | Sep 24, 2025 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | St. Louis District, St. Louis County, Bennington Place, concrete pavement repair, mill and asphalt overlay, and upgrading sidewalk, curb ramps, and traffic signal equipment | 8/27/25 | 9/24/25 | |
| Addendum 1 | St. Louis District, St. Louis County, Bennington Place, concrete pavement repair, mill and asphalt overlay, and upgrading sidewalk, curb ramps, and traffic signal equipment Addendum 1 | 8/29/25 | 9/24/25 |

With GovernmentContracts, you can:
...work includes the furnishing of materials, tools, equipment and labor necessary to construct ...
Drexel Technologies
Bid Due: 7/09/2026
...work includes the furnishing of materials, tools, equipment and labor necessary to construct ...
Drexel Technologies
Bid Due: 7/09/2026
...for this Project. This bid includes the following Work: All materials, labor, equipment, ...
Drexel Technologies
Bid Due: 7/07/2026
...for this Project. This bid includes the following Work: All materials, labor, equipment, ...
Drexel Technologies
Bid Due: 7/07/2026