| Location: | Missouri |
|---|---|
| Posted: | Aug 29, 2025 |
| Due: | Sep 24, 2025 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | St. Louis District, St. Louis County, Bennington Place, concrete pavement repair, mill and asphalt overlay, and upgrading sidewalk, curb ramps, and traffic signal equipment | 8/27/25 | 9/24/25 | |
| Addendum 1 | St. Louis District, St. Louis County, Bennington Place, concrete pavement repair, mill and asphalt overlay, and upgrading sidewalk, curb ramps, and traffic signal equipment Addendum 1 | 8/29/25 | 9/24/25 |

With GovernmentContracts, you can:
...Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, City ...
Missouri Department of Transportation(MDOT)
Bid Due: 10/07/2026
...consist of construction of a new concrete multi-use trail from approximately 0.3 miles ...
Drexel Technologies
Bid Due: 10/01/2026
...consist of construction of a new concrete multi-use trail from approximately 0.3 miles ...
Drexel Technologies
Bid Due: 10/01/2026
...Status Bid Advertisement Post Date Revision Date Letting Date NEW KC District, City ...
Missouri Department of Transportation(MDOT)
Bid Due: 9/30/2026