| Location: | Utah |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Apr 8, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-051 |
| Publication URL: | To access bid details, please log in. |
Project Description: The WORK includes the installation of approximately 3,180 linear feet of 12” DR-18 C900 waterline, 10,075 linear feet of 8” waterline, 260 linear feet of 6” DR-18 C900 waterline 130 water service extensions, connecting 97 water service to new main line, installing 31 new fire hydrants, installing 1,524 linear feet of 8” dual wall perforated HDPE pipe, 7 new 48” diameter manholes, approximately 137,300 square feet of asphalt, and other utility and roadway improvements.

With GovernmentContracts, you can:
...with 836 linear feet of 8-inch water main, installation of 3 new fire ...
State Government of Utah
Bid Due: 6/17/2026
...of epoxy lined and coated 20-inch steel pipe connection to a 42-inch JVWCD ...
State Government of Utah
Bid Due: 7/07/2026
...and plumbing of a new mop sinkand replumbing the existing water heater TPR ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/09/2026