| Location: | South Carolina |
|---|---|
| Posted: | May 22, 2025 |
| Due: | Jun 26, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WP-1-2025 |
| Publication URL: | To access bid details, please log in. |
Work includes installing stop logs in basin flumes; installing 3 flume drain valves; installing 3 slide gates; remove/replace coatings in basins & flumes as required; concrete crack repair in the Filter Gallery; and remove/replace concrete apron, trench drain and grating at truck offloading. Contact Chad Walters, PE ( cmwalters@garverusa.com ) to obtain Bid Documents.

With GovernmentContracts, you can:
...5400029841 Water Treatment Services Natural Resources 07/07/2026 10:00:00 AM...
State Fiscal Accountability Authority
Bid Due: 7/07/2026
...providing all NSF-certified materials, equipment, and labor to remove solids from the water ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/02/2026
...of this document, but also must consider the unique local context of the ...
City of Clemson
Bid Due: 7/14/2026
...Project ID: 2110-RFP Title: Diesel Pump for Wastewater Treatment Plant Addenda: 0 Release ...
City of Rock Hill
Bid Due: 6/23/2026