| Location: | Florida |
|---|---|
| Posted: | Jun 2, 2026 |
| Due: | Jul 1, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA481926Q0032 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
NOTE: There will be a site visit conducted on June 10, 2026 at 10am CDT. EAL is due NLT 1300 CDT on June 6, 2026. If you already have access to Tyndall Air Force Base an EAL is not required. Attachment L contains the information for when questions are due by.
The Contractor to engineer, furnish, install and test (EFI&T) premise wiring within building 549 at Tyndall AFB. Newly installed premise wiring will support Unclassified but Sensitive Internet Protocol Router Network (NIPRNet). The Contractor shall provide all materials, transportation, labor, management, tools, and other incidentals necessary to meet the requirements. All materials provided shall be new and not refurbished. The Contractor must identify any base support requirements (for example, laydown and storage areas) necessary to complete this project. The Contractor shall coordinate with 325CS for storage space and staging area requirements. The Contractor shall restore all disturbed grounds/base property to the "as found" condition or better after installation. Base grounds/property restoration requirements shall be complied with.
| May 15, 2026 | [Sources Sought (Original)] Premise wire |
| Jul 1, 2026 | [Combined Synopsis/Solicitation (Updated)] Premise wire - Solicitation |

With GovernmentContracts, you can:
...Network Equipment & Installation County Wide 17-205-137 N/A 06/30/19...
Pinellas County Schools
Bid Due: 2/07/2027
...Wireless Network Equipment & Installation County Wide 1 17-205-137 N/A 06/30/19...
Pinellas County Schools
Bid Due: 2/16/2027
...Project ID: Title: Camping World Stadium Converged Network System (CNS) Design and Installation... ...
City of Orlando
Bid Due: 10/20/2026
...Munoz Title Internet, Wide Area Network (WAN) and Special Construction Installation Services Secondary... ...
Osceola County School Board
Bid Due: 11/12/2026