| Location: | California |
|---|---|
| Posted: | May 8, 2026 |
| Due: | May 22, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W50S6T26BA019 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The full solicitation is posted on the PIEE solicitation module at: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S6T26BA019¬iceType=SolicitationNotice
Bids must be submitted through the PIEE solicitation module. Details are located at Section L - Instructions, Conditions, Notices to Offerors or Quoters on the SF 1442. Prospective contractors must gain solicitation submission access through https://piee.eb.mil/
The 144th Fighter Wing at Fresno Air National Guard Base (ANGB) intends to award a single firm-fixed-price contract for non-personal construction services, to include all plant, labor, transportation, materials, tools, equipment, permits, and supervision necessary to remove four existing Heating, Ventilation, and Air Conditioning (HVAC) units and their auxiliary air ducting and electrical and drain lines. After all existing HVAC units have been removed, the contractor shall install a new 40-ton HVAC system, necessary ducting, electrical, and drain lines to provide for the following training equipment environmental constraints - Operating Temperature: 59 to 78 F, (15 to 26 C), Operating Humidity: 35% to 80% RH (non-condensing), Storage Temperature: 32 to 120 F, (-29 to 38 C), Storage Humidity: 20% to 80% RH (non-condensing). Services shall also include the removal and replacement of existing dust covers with custom-made roof adapters to transition from current ductwork in room serviced by the new packaged units. In order to maintain the existing security integrity of the building and comply with Intelligence Community Directive (ICD) Number 705, no new penetrations in the building are permitted. The Contractor must use existing penetrations to the maximum extent practicable. All work must also conform to Unified Facilities Criteria (UFC) 3-410-01. Site visit details are located at Section L - Instructions, Conditions, Notices to Offerors or Quoters on the SF 1442. A bid guarantee is required in accordance with provision 52.228-1 on the SF 1442.
| Apr 22, 2026 | [Presolicitation (Original)] N041 - HAYW 26011 Replace HVAC B122 |
| May 8, 2026 | [Presolicitation (Updated)] N041 - HAYW 26011 Replace HVAC B122 |

With GovernmentContracts, you can:
...Project ID: MS26-137 Title: QUALIFIED PLUMBING MAINTENANCE, REPAIR, AND INSTALLATION Addenda: 0... Overview ...
City of Victorville
Bid Due: 6/16/2026
...System Wide AMI & Water Meter Installation-Phase 1 The work consists in general ...
City of Turlock
Bid Due: 6/22/2026
...of new underground and overhead piping systems Installation of plumbing fixtures and related... ...
Fontana Unified School District
Bid Due: 6/08/2026
...: Product Service Code: NAICS Code: 238220 - Plumbing, Heating, and Air-Conditioning Contractors..., ...
ENERGY, DEPARTMENT OF
Bid Due: 6/15/2026