Z2DA--Replace Auxiliary Chiller
| Location: |
Federal |
| Posted: |
Dec 9, 2025 |
| Due: |
Jan 26, 2026 |
| Agency: |
VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
36C24626B0004 |
| Publication URL: |
To access bid details, please log in. |
Z2DA--Replace Auxiliary Chiller
Active
Contract Opportunity
Related Notice
36C24626B0004
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
246-NETWORK CONTRACTING OFFICE 6 (36C246)
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Dec 09, 2025 03:49 pm EST
-
Original Date Offers Due: Jan 26, 2026 03:00 pm EST
-
Inactive Policy: Manual
-
Original Inactive Date:
May 05, 2026
-
Initiative:
Classification
-
Original Set Aside:
-
Product Service Code: Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
-
238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Description
Scope of Work
Replace Auxiliary Chiller at Building 3
Project Number: 565-24-113
Scope of Work
Location: 2300 Ramsey Street, Fayetteville, NC 28601, Located outside of Building 3
Scope:
Remove and replace the existing 120-ton auxiliary chiller at Building 3. The purpose of this chiller is to provide chilled water redundancy to Building 3. The new auxiliary chiller shall be the same size/capacity as the existing chiller and shall be fully functional.
The contractor shall replace and install all required piping, valves, supports, and controls. The new auxiliary chiller shall be integrated with the existing Building Automation System (BAS). Chiller controller shall be BACNET compliant, and all data points should be pulled through the BACNET connection. The contractor shall install minimum (hard wired) data points to include but not limited to (1) Start/Stop, (2) Status, and (3) Alarm (hard wired). All low voltage control wirings must be installed in blue control conduit. All graphics/trends and digital alarming associated with the new chiller must be updated on the Tridium Direct Digital Control (DDC) Supervisor located in Room 2 in Building no. 35.
The contractor shall replace two (2) 250 gpm pumps located in an adjacent mechanical room; shown on Sheet M103 as B-20A. Contractor may reuse the existing concrete pads. Replace/reroute piping, if required, to install the new pumps. Pumps shall be programmed into the BAS with the same data points as the chiller.
*Note that the existing auxiliary chiller has two electrical circuits.
Contractors are strongly encouraged to attend the pre-bid site visit. The date is to be determined.
Requirements:
All work shall be performed in full accordance with applicable local and Federal regulations. All equipment and installation shall conform to the VA master specifications, recommendations of the National Fire Protection Association (NFPA), and Underwriters Laboratories, Inc. The contractor shall use good safety practices during demolition and installation.
The contractor shall conduct a pre-installation site visit to verify field conditions.
The contractor shall attend a pre-construction meeting with VA stakeholders
The contractor shall perform testing and demonstrate proper operations of new chiller with VA maintenance.
The contractor shall submit the following to the VA upon completion:
Operation & Maintenance manuals
Warranty documentation
Storage: No storage of any material will be allowed on VA property.
Period of Performance: To be completed within 6 months of NTP. This should allow adequate time for product lead times.
Hours of Operation: Normal working hours: 0800-1700, M-F. Evening and weekend work may be approved by COR.
Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. The contractor shall submit a request to interrupt any such services to COR, in writing, 28 days in advance of the proposed interruption.
Attachments:
Attachment 1-M103 AHU 30 Bldg. 3 Mech Room 20 Chilled Water 2014 drawing from a 2014 construction project
Photo 1-Existing Airstack Chiller at Bldg. 3
Photo 2-Data Plate west Airstack existing chiller data plate
Specs AuxChillBldg3
END SCOPE OF WORK
Attachments/Links
Contact Information
Contracting Office Address
-
100 EMANCIPATION DR
-
HAMPTON , VA 23667
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.