10 Horse Trailer
| Location: |
Virginia |
| Posted: |
Sep 25, 2025 |
| Due: |
Oct 2, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- 23 - Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles
|
| Solicitation No: |
W911S225U2141 |
| Publication URL: |
To access bid details, please log in. |
10 Horse Trailer
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
-
Original Published Date: Sep 25, 2025 09:20 am EDT
-
Original Date Offers Due: Oct 02, 2025 06:00 pm EDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Oct 15, 2025
-
Initiative:
Classification
Description
10H Bloomer Trailer or Equivalent. Delivery to Fort Myer, VANLT than 180 days from award. ? Ten Horse Slant Gooseneck ? BRAKES -- Electrichydraulic disc brakes ? AXLES -- Torsion axles ? AXLE -- Tri-axle 8,000# with elec / hyd /disc brakes ILO Tandem 7000# (Heavy Duty) ? WHEELS -- Four 16in aluminum wheels ?Spin balanced tires and wheels ? TIRE -- Triple 14 Ply Continental HS3 265 tires w/ 19.5Alum wheels ILO std (5500lb cap) ? ROOF -- .040 one piece continuous roof skin ?GOOSENECK -- Aerodyne nose Stainless nose sheet ? COUPLER -- 30,000lb 2- 5/16adjustable coupler ? JACK -- 10,000lb drop leg jack ? WINDOW ? 24in x 24in Drop downwindow w/ bars - hip side ea stall, 14in x 34in sliding windows in gooseneck ea side ?VENT -- Framed roof vent per stall ? EXTERIOR -- Continuous polished side slats w/white skin above ? LIGHTS -- LED running lights ? LIGHT -- 4 Turn signals high and low? LIGHT -- 6 Flush mount LED loading lights ? LIGHT -- 1 LED dome light per divider 1LED dome light in rear tack ? LIGHT -- Push button exterior switches ? DIVIDERS --Flow through bars in head and wither ? RUBBER -- Padding on dividers ? RUBBER --Protective rubber on walls in horse compartment ? RUBBER -- Premium rubber on floor inhorse compartment ? RUBBER -- Shin guard at loading door ? RUBBER MAT -- Floormats ? DOORS -- Swing feed doors w/ drop windows at the head of each stall ? DOORS --Gas shocks on swing feed doors DOORS -- Dressing room door w/ 14in x 20in window ?DOORS -- 50/50 rear doors w/ 14in x 20in windows ? DOORS -- Lined and insulated ? 1 each STEP -- 1 Fold up step on DR door ? FENDER -- Extruded interior wheel wells w/ bevel ?ROOF -- Lined and insulated roof in horse compartment and rear tack ? WALL ? 2in sidewall and roof construction ? WALL -- Lined and insulated walls in horse compartment ?TACK -- Stationary rear tack ? TIES -- Two interior horse ties per stall ? TIES -- Twospring loaded exterior horse ties per horse ? BARS -- Permanent window bars in feed doors? BARS -- Blanket bars ? SADDLE RACK -- One saddle rack per horse ? HOOKS --Bridle hooks ? TRAYS -- Brush trays ? SIZE ? 7ft6in or 8ft wide and 7ft6in tall ILO std.(Option 1001) ? SIZE -- Add width and height per ft of additional floor over 30 ft ? SIZE --Add width and height per ft of additional floor over 40ft ? HEIGHT -- Add up to 6in heightper foot of floor (up to 30ft) ? HEIGHT -- Add up to 6in height (after 30ft) per foot ofadditional floor ? BRACE -- Charge for dual leg brace ? JACK -- Dual leg hydraulic jacks ?BATTERY -- Aluminum Triple battery box w/ dual batteries wired up ? SOLAR -- 10 wattsolar panel on roof wired up ? LIGHT -- Additional running lights in top rail (each) ? --LED dome light (each) ? LIGHT -- Flush mount side turn signals. ? LIGHT -- LED loadinglight ? GOOSENECK -- Add heavy duty hitch ? STEP -- Fold up step ? DOOR -- Escapedoor (includes feed door w/drop window ? MANGER -- Additional manger on escape door,includes drain pipe ? MANGER -- Slant load trailer ea. Stall (incls outside access door) ?DIVIDER -- Full divider ILO std. (bottom only) ? RUBBER -- Rubber both sides ofremovable panel or full to floor divider ? RUBBER MAT -- Hanging mat (per divider) ?DOOR -- Dressing room or tack room door with window ? DOOR -- Make door 4in widerthan std ? WALL -- Change rear tack wall other than 50/50 ? DOOR -- Side entry RT doorILO standard rear entry ? ROOF -- Insulate and line roof and top rail w/PPW ? WINDOW -- Delete 14in X 20in window from standard door ? WINDOW ? 14in X 34in window withbars (sliding) ? RAMP -- 3/4 width rear ramp ? 56in ? SADDLE RACK -- Additionalsaddle ? SADDLE RACK -- Saddle racks (each saddle ? BARS -- Add post for blanket tree? BARS -- Blanket bars ? HOOKS -- Bridle hooks ? TRAYS -- Brush trays ? LOCK --Keyless dead bolt lock
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
-
Sep 25, 2025 09:20 am EDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.