| Location: | Pennsylvania |
|---|---|
| Posted: | Jan 29, 2026 |
| Due: | Feb 25, 2026 |
| Agency: | Allegheny County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ADAR-2025 |
| Publication URL: | To access bid details, please log in. |
Project Description: This work provides for the construction of curb ramps with crosswalks and associated signal modifications on various County roads located within various municipalities. The work includes but is not limited to the design and construction of new curb ramps and new sidewalk, removal of existing sidewalks, asphalt base replacement, traffic signal modifications, placement of topsoil, seeding and soil supplements, standard pavement markings, erosion and sedimentation control, and the maintenance and protection of traffic during construction.

With GovernmentContracts, you can:
..., native woodland seed mix establishment, shrub and tree plantings, live staking, stream ...
PennBid
Bid Due: 7/02/2026
...erosion and sediment controls, as well as ensuring appropriate traffic management and safety ...
PennBid
Bid Due: 7/17/2026
...stabilization matting, landscaping, rock vane installation and erosion and sediment controls as required ...
PennBid
Bid Due: 6/15/2026
...Work also includes soil erosion and sedimentation control measures, traffic control, and restoration....
PennBid
Bid Due: 6/09/2026