| Location: | Pennsylvania |
|---|---|
| Posted: | Jan 29, 2026 |
| Due: | Feb 25, 2026 |
| Agency: | Allegheny County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ADAR-2025 |
| Publication URL: | To access bid details, please log in. |
Project Description: This work provides for the construction of curb ramps with crosswalks and associated signal modifications on various County roads located within various municipalities. The work includes but is not limited to the design and construction of new curb ramps and new sidewalk, removal of existing sidewalks, asphalt base replacement, traffic signal modifications, placement of topsoil, seeding and soil supplements, standard pavement markings, erosion and sedimentation control, and the maintenance and protection of traffic during construction.

With GovernmentContracts, you can:
.... * Surveying, site preparation, erosion and sediment controls and restoration. ... water ...
PennBid
Bid Due: 6/19/2026
...stabilization matting, landscaping, rock vane installation and erosion and sediment controls as required ...
PennBid
Bid Due: 6/15/2026
..., native woodland seed mix establishment, shrub and tree plantings, live staking, stream ...
PennBid
Bid Due: 7/02/2026
...subbase, base course and wearing course, installing erosion and sediment control facilities...
PennBid
Bid Due: 6/10/2026