861CM3011: Facility Condition Assessment (FCA) Deficiencies Corrections Repairs, Mill Springs National Cemetery
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Apr 02, 2025 07:25 am EDT
-
Original Published Date: Feb 19, 2025 09:11 am EST
-
Updated Date Offers Due: Apr 07, 2025 10:00 am EDT
-
Original Date Offers Due: Mar 28, 2025 10:00 am EDT
-
Inactive Policy: Manual
-
Updated Inactive Date: May 07, 2025
-
Original Inactive Date:
Jun 26, 2025
-
Initiative:
Classification
-
Original Set Aside:
-
-
Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
-
237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Description
Facility Condition Assessment (FCA) Deficiencies Corrections Repairs, Mill Springs National Cemetery.
The Price schedule is hereby change Delete sub-CLIN I through XIII in its entirety.
Price schedule modified from from:
PRICE/COST SCHEDULE
Item Information
CLIN
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
861CM30111
1.00
JB
$__________________
$__________________
Base Bid
All work shown or specified within the drawings and specifications.
The Contractor shall provide all Management, Supervision, Labor, Materials, Equipment, Parts, Tools, etc., required, and necessary to complete and provide construction services to Correct Cemetery Facility Condition Assessment (FCA) Deficiencies, as stated and described herein, at Mill spring National Cemetery.
The Contract Period of Performance (POP) is two hundred and seventy (270) Calendar Days from issuance of the Government s Notice to Proceed letter.
NOTICE: A contract award will be made to the responsible bidder who submitted the lowest responsive bid for ALL work specified. A single award will be made on the Grand Total Base Bid Amount for all work, inclusive of the thirteen (13) stated items. Bidder must provide a breakdown cost for each of the below listed items (which will be included in the Grand Total Base Bid Amount).
GRAND TOTAL BASE BID AMOUNT
$__________________
DESCRIPTION
QUANTITY
UNIT
AMOUNT
ITEM I
1.00
JB
$__________________
Maintenance Building 3001 HVAC: Work includes updating, repairing, and replacing HVAC system as well as installing an air handling unit
ITEM II
1.00
JB
$__________________
Maintenance Building 3001 Lightning Protection: Work includes repairing lightning protection
ITEM III
1.00
JB
$__________________
Maintenance Building 3001 Insulation: Work includes installing attic fiberglass insulation between the attic wood rafters
ITEM IV
1.00
JB
$__________________
Maintenance Building 3001 Accessibility: Work includes removal of existing ramp and railings and replace with new concrete ramp and ramp and railing
ITEM V
1.00
JB
$__________________
Maintenance Building 3001 Signage: Work includes installing exterior identification signage
ITEM VI
1.00
JB
$__________________
Site Conditions Road Repairs: Work includes mill and re-surface around North Drive, East Drive, South Drive, and Center Drive see Civil Site Plan
ITEM VII
1.00
JB
$__________________
Site Conditions Guardrail/Signage: Work includes installing post and chain from east of POW/MIA flagpole to Committal Shelter one area as well as Site Wayfinding for POW/MOA assembly area
ITEM VIII
1.00
JB
$__________________
Site Conditions Irrigation: Work includes installing new irrigation system per plans in areas of section A through M .
ITEM VIIII
1.00
JB
$__________________
Site Conditions Drainage: Work includes removal of trees and debris in two drainage ditches northeast of maintenance building and burial sections and reconstruct with Rip Rap and filter fabric lined ditches per plans and specs
ITEM X
1.00
JB
$__________________
Site Conditions Flower Watering Stations: Work includes the removal of two older model flower watering stations and replacing with standard Flower Watering Station with Flower Vase and Trash Receptacles
ITEM XI
1.00
JB
$__________________
Site Conditions Monuments/Private, Non-Military Headstones: Work includes repairing monuments / private non-military headstones
ITEM XII
1.00
JB
$__________________
Site Conditions Committal Shelter: Work includes demolition of the existing committal shelter down to the ground surface and the demolition of the concrete pad and railing adjacent to rock retaining wall. Retaining wall is to be protected during demolition for reuse. Clean and repoint mortar in face of retaining wall. Install new safety railing. Work also includes placement of new hardscape seating area, benches, sidewalk and landscaping as specified in the civil site plan
ITEM XIII
1.00
JB
$__________________
Site Conditions Wayfinding/Signage: Work includes installation, repair or replacement for signage. Military service seals at the New Committal Shelter in the expansion area are to be removed and repositioned with addition of a new U.S. Space Force seal. Install per plans and specs
Price Schedule changes to:
PRICE/COST SCHEDULE
Item Information
CLIN
DESCRIPTION
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001
861CM30111
1.00
JB
$__________________
$__________________
Base Bid
All work shown or specified within the drawings and specifications.
The Contractor shall provide all Management, Supervision, Labor, Materials, Equipment, Parts, Tools, etc., required, and necessary to complete and provide construction services to Correct Cemetery Facility Condition Assessment (FCA) Deficiencies, as stated and described herein, at Mill spring National Cemetery.
The Contract Period of Performance (POP) is two hundred and seventy (270) Calendar Days from issuance of the Government s Notice to Proceed letter.
NOTICE: A contract award will be made to the responsible bidder who submitted the lowest responsive bid for ALL work specified. A single award will be made on the Grand Total Base Bid Amount for all work, inclusive of the thirteen (13) stated items. Bidder must provide a breakdown cost for each of the below listed items (which will be included in the Grand Total Base Bid Amount).
GRAND TOTAL BASE BID AMOUNT
$__________________
Attachments/Links
Contact Information
Contracting Office Address
-
CENTRALIZED CONTRACTING DIVISION 5105 RUSSELL ROAD
-
QUANTICO , VA 22134
-
USA
Secondary Point of Contact
History
-
Apr 02, 2025 07:25 am EDTSolicitation (Updated)
-
Mar 19, 2025 08:11 am EDT
Solicitation (Updated)
-
Mar 14, 2025 01:46 pm EDT
Solicitation (Updated)
-
Feb 26, 2025 01:13 pm EST
Solicitation (Updated)
-
Feb 26, 2025 07:57 am EST
Solicitation (Updated)
-
Feb 20, 2025 12:05 pm EST
Solicitation (Updated)
-
Feb 20, 2025 11:30 am EST
Solicitation (Updated)
-
Feb 20, 2025 11:23 am EST
Solicitation (Updated)
-
Feb 19, 2025 09:20 am EST
Solicitation (Updated)
-
Feb 19, 2025 09:11 am EST
Solicitation (Original)
-
Feb 10, 2025 02:45 pm EST
Presolicitation (Updated)