| Location: | Pennsylvania |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Apr 7, 2026 |
| Agency: | Pittsburgh Water & Sewer Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2023-600-101-5 (2026-035) |
| Publication URL: | To access bid details, please log in. |
Project Description: Pittsburgh Water is requesting bids for phased construction at their Operations Center under a multi-prime bid consisting of General, Electrical, HVAC, and Plumbing contracts. The General Contract scope of work includes but is not necessarily limited to: site work, subgrade preparation, utilities on the site, and utilities up to the building; layout and staking; installation of temporary fencing; utility coordination; mine grouting and geopier installation; work related to net zero ready passive house goals; project coordination as it involves other trades; obtaining permits; securing bonds as required by Owner; coordination with other prime contractors including managing the scheduling of construction activities of the prime contractors; and management of scope of work impacted by other prime contractors.

With GovernmentContracts, you can:
...of Microtransit Software and scheduling for three pilot zones in Lancaster County, Pa. ...
PennBid
Bid Due: 6/18/2026
...optimization by prioritizing scheduling through the lens of capacity, productivity, geography, and risk... ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...demands. This includes strategic fieldwork optimization by prioritizing scheduling through the lens... will ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...either at the awarded contractor’s designated location or resident’s bedside. Scheduling...
State Government of Pennsylvania
Bid Due: 6/03/2026