| Location: | Utah |
|---|---|
| Posted: | Apr 2, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-003 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work consists of widening, mill-and-overlay, and restriping of the existing 800 West road from Pioneer Crossing to Pony Express Parkway (approximately 1.6 miles) and a realignment of the 800 West / 400 North / Evans Lane intersection to eliminate existing offset. Demolition work includes removal of existing asphalt pavement, removal of existing concrete, curb, utilities, street signs, etc. New construction work includes mill and overlay of existing asphalt pavement, road widening, signage, earthwork, installation of concrete curb and gutter, concrete sidewalk, street signs, roadway striping, storm drain pipe and structures, trenching vault and conduit installation for power, adjust utility manholes, and a fully signalized intersection at 400 North.

With GovernmentContracts, you can:
...is located at 5955 S Painted Ridge Parkway. The bid includes the following: ...
City of St. George
Bid Due: 6/11/2026
...includes stripping, stockpiling, and reuse of topsoil, site grading and earthwork, and implementation...
State Government of Utah
Bid Due: 6/08/2026