| Location: | Florida |
|---|---|
| Posted: | Jan 28, 2026 |
| Due: | Feb 26, 2026 |
| Agency: | Walton County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-06 |
| Publication URL: | To access bid details, please log in. |
Project ID: 26-06
Title: On-Site Concrete Crushing with Multi-Size Aggregate Output and Contaminant Removal
Addenda: 0
Release Date: 1/28/2026
Due Date: 2/26/2026
The proposed project, hereinafter referred to as the ‘Project,’ consists of providing on-site concrete crushing and processing services for Walton County.
Location: Walton County Landfill
Contract Time: The Contractor shall complete all required crushing and processing within a maximum of 120 calendar days from the date of Notice to Proceed, unless extended by the County due to weather, equipment failure, or site-access limitations.
Walton County Public Works has accumulated a stockpile of concrete debris at a County-designated site that requires processing into a usable aggregate material. To support ongoing roadway and maintenance operations, the County is seeking a qualified contractor to provide on-site crushing and processing services. The Project will convert existing concrete debris into a road-base-suitable aggregate meeting County specifications, improving material availability and reducing the need for purchasing new aggregate from outside sources.

With GovernmentContracts, you can:
...to provide cleaning, sandblasting, inspection, concrete repair/restoration, chemical-resistant coating... installation, equipment removal/reinstallation, and ...
City of Palm Coast
Bid Due: 7/09/2026
..., and controls; C. Installation of new concrete cooling tower basin, separate concrete ...
State Government of Florida
Bid Due: 6/27/2026
...depth concrete on the eastbound deck, sidewalk, and railing on Span - 47. ...
Volusia County
Bid Due: 7/09/2026
...* removal of existing concrete traffic separator * hydro blasting (bridge deck) * ...
State Government of Florida
Bid Due: 6/19/2026