| Location: | California |
|---|---|
| Posted: | Apr 2, 2025 |
| Due: | Apr 15, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: B617 INSTALL SOLAR AND BATTERY SYS (POM 23-035)
Addenda: 1
Release Date: 3/4/2025
Due Date: 4/15/2025
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing of a 60kW DC solar and 150kWh battery system for POM B617 and B634.

With GovernmentContracts, you can:
...GFO-25-306 - Solar PV Located in Non-traditional Terrain (SPLINT) Solicitation Type Grant Funding... ...
California Energy Commission
Bid Due: 6/16/2026
...consists of pavement widening, installation of a solar speed feedback sign system, roadside ...
Contra Costa County
Bid Due: 6/23/2026
..., coal, nuclear, solar, wind, geothermal, and landfill gas; and holds partial shares ...
City of Pasadena
Bid Due: 7/07/2026
...of a new park with a walking trail, colored concrete plazas, play area, ...
City of Anaheim
Bid Due: 6/18/2026