| Location: | California |
|---|---|
| Posted: | Apr 2, 2025 |
| Due: | Apr 15, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: B617 INSTALL SOLAR AND BATTERY SYS (POM 23-035)
Addenda: 1
Release Date: 3/4/2025
Due Date: 4/15/2025
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing of a 60kW DC solar and 150kWh battery system for POM B617 and B634.

With GovernmentContracts, you can:
...Project ID: 2026-RFP-0189 Title: Design-Build Services for Solar and Energy Storage Installations... Design-Build ...
City of Pasadena
Bid Due: 9/30/2026
...power systems throughout the design, development, analysis, integration, testing, and qualification... lifecycle. Relevant ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 10/02/2026
...: San Diego , CA 92126 USA Description This project will provide designs, ...
DEPT OF DEFENSE
Bid Due: 10/14/2026
...approval of solar and, just recently, a suite of energy-efficiency permits, significantly improving...-effectiveness ...
City of Pinole
Bid Due: 9/21/2026