| Location: | Washington |
|---|---|
| Posted: | Nov 1, 2024 |
| Due: | Nov 8, 2024 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Chambers Creek Regional Wastewater Treatment Plant Headbox Rehabilitation
Addenda: 1
Release Date: 10/18/2024
Due Date: 11/8/2024
The work involves the replacement of existing assets, including two sluice gates, a light post, a wastewater level element, electrical for the aforementioned assets, miscellaneous pipe, and exterior hand railing. Work will also include the installation of an interior concrete coating and an interior work platform. To perform work inside the Headbox, the successful bidder will be required to construct and maintain flow bypass systems that will bypass all wastewater that normally flows through the Headbox structure.

With GovernmentContracts, you can:
...Contract I-5/I-205, Concrete Panel Rehabilitation Contract summary Requires replacing cement... concrete panels, repairing ...
State Government of Washington
Bid Due: 6/17/2026
...for slab concrete needed for station rehabilitation. FMNT is responsible for maintenance of ...
Washington Metropolitan Area Transit Authority
Bid Due: 6/18/2026
...Post Date 05/20/2026 Quest Number 10209332 Category Code Buried Storage Tanks,Concrete Repair... ,Concrete ...
City of Wenatchee
Bid Due: 6/16/2026