| Location: | South Carolina |
|---|---|
| Posted: | Dec 18, 2025 |
| Due: | Jan 14, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H47-9592-CB |
| Publication URL: | To access bid details, please log in. |
Contractor shall furnish all resources, to include but not limited to, materials, supplies, equipment, labor and supervision for 1) cleaning of four Aboveground Storage Tanks (ASTs) with residual No. 6 fuel oil, 2) abatement of materials identified as asbestos containing materials (ACM), 3) demolition of the ASTs with associated piping and Pump House and 4) restoration of the project area to the elevations or grades requested by Winthrop Uni.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Method: Design-Bid-Build Construction Cost Range: $2,800,000 to $3,000,000 Agency Project Coordinator... DESIGN-BID-BUILD CONSTRUCTION ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026