| Location: | South Carolina |
|---|---|
| Posted: | Dec 18, 2025 |
| Due: | Jan 14, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H47-9592-CB |
| Publication URL: | To access bid details, please log in. |
Contractor shall furnish all resources, to include but not limited to, materials, supplies, equipment, labor and supervision for 1) cleaning of four Aboveground Storage Tanks (ASTs) with residual No. 6 fuel oil, 2) abatement of materials identified as asbestos containing materials (ACM), 3) demolition of the ASTs with associated piping and Pump House and 4) restoration of the project area to the elevations or grades requested by Winthrop Uni.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: $900,000 to $1,000,000 Agency Project Coordinator... Details: https://scbo.sc.gov/files/scbo/P24-6104-PD_SE-310.pdf ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...9, 2026 - 11:00am Project Location: Wallace House Project Delivery Method: Design-Bid-Build.../ Project ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...Project Delivery Method: Design-Bid-Build Construction Cost Range: $375,000 to $415,000 Agency Project.../files/scbo/SE-310_D50-6188-JM.pdf Print ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...selected firm will provide architectural and engineering (A/E) design services . Construction... Project ...
Beaufort County
Bid Due: 7/01/2026