St. Vincent Greenway: Robert L. Powell Place to St. Charles Rock Road – 187B (Phase 3)
STP – 9901 (666)
Notice to Contractors
The Great Rivers Greenway District (District), the Developer, is soliciting sealed bids for St. Vincent Greenway - 187B
(Phase 3) in the cities of Pagedale and Wellston, Missouri.
The proposed work includes the extension of the St. Vincent Greenway in the cities of Pagedale and Wellston, MO from
the existing endpoint at Plymouth Ave and Robert L Powell Place to Page Ave and from Pagedale City Hall to 70th St.
ending on the south side of St. Charles Rock Road. Improvements include trail construction, wayfinding signage, parking
stalls, grading and drainage, sewers, curbs, and landscaping.
Bids may be submitted electronically until 3:00 P.M. prevailing Central time, June 18, 2026 via the Bid Express website
at bidexpress.com. Sealed bids, addressed to Great Rivers Greenway, 3745 Foundry Way, Suite 253, St. Louis, Missouri
63110, for the proposed work will be received by Great Rivers Greenway until 3:00 P.M. (prevailing Central time) on June
18th, 2026, at the office of Great Rivers Greenway, and at that time will be publicly opened. The bid opening can be
attended virtually via the following zoom link:
https://us02web.zoom.us/j/88017293964?pwd=pNEw214hyPYaRmmEEKuIm7piJ9xBKe.1&from=
addon
Questions should be submitted via Bid Express. All requests for clarification on these bidding documents must be received
in writing by June 5, 2026 at 5:00 PM prevailing Central time. A Pre-Bid Conference will be held on May 28, 2026 at
2:30 PM prevailing Central time at the Great Rivers Greenway office at 3745 Foundry Way, Suite 253, St. Louis, Missouri
63110. The bid opening will also be held virtually via Zoom. Login information is listed here:
All documents necessary to submit a bid will be available via the Bid Express website including plans, specifications, and
bid packages beginning Thursday, May 21st, 2026. Hard copies of the Bid Documents can be obtained starting May 21st
from Cross Rhodes Reprographics, 2731 S Jefferson Ave, St. Louis, MO 63118, (314)678-0087. The Contractor is
responsible for the drawing costs. Questions should be submitted via Bid Express. All requests for clarification on these
bidding documents must be received in writing by June 5, 2026 at 5:00 PM prevailing Central time.
A Pre-Bid Conference will be held on Wednesday, May 28th, 2026 at 2:30PM prevailing Central time in Great Rivers
Greenway offices at 3745 Foundry Way, Suite 253, St. Louis, MO 63310. This conference can also be attended virtually
via the following zoom link:
https://us02web.zoom.us/j/89863327109?pwd=HwVUrjBRUITx97gKLEXSMRDR1jEliN.1&from=
addon
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate
of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations
(Federal Wage Rate), or state wage rate, whichever is higher.
The Great Rivers Greenway District hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged
individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 from the current version of the Missouri
Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7
days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works projects provide a