June 10, 2026
INFORMAL WRITTEN QUOTE
IWQ #130841
Gwinnett County is soliciting competitive quotes from qualified contractors for the Replacement of a
Pavilion Pergola for the Department of Parks and Recreation.
Quotes should be typed or submitted in ink and returned to the Attention of Casey Beauston, Purchasing
Associate III. Quotes should be received by 3:00 P.M. on June 25, 2026 by email
casey.beauston@gwinnettcounty.com or sent to the Gwinnett County Financial Services - 2nd Floor -
Purchasing Division, 75 Langley Drive, Lawrenceville, Georgia 30046.
Questions regarding quotes should be directed to Casey Beauston, Purchasing Associate III, at
casey.beauston@gwinnettcounty.com or by calling 770-822-7995 no later than 3:00 P.M. on June 16,
2026. Quotes are legal and binding upon the bidder when submitted. The written Quote documents
supersede any verbal or written prior communications between the parties.
Successful awarded contractor will be required to meet insurance requirements. Insurance Company must
be authorized to do business in Georgia by The Georgia Insurance Department, listed in the Department of
Treasury's Publication of Companies holding Certificates of Authority as Acceptable Surety on Federal
Bonds and as acceptable reinsuring companies, and must have an A.M. Best rating of A-7 or higher.
Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs
or activities. Any requests for reasonable accommodations required by individuals to fully participate in
any open meeting, program or activity of Gwinnett County Government should be directed to the ADA
Coordinator, Gwinnett County Justice and Administration Center, 770-822-8165.
Award will be made to the contractor submitting the lowest responsive and responsible quote. Gwinnett
County reserves the right to reject any or all quotes, to waive technicalities, and to make an award deemed
in its best interest. Quotes may be split or awarded in entirety. Gwinnett County reserves the option to
negotiate terms, conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion.
We look forward to your quote and appreciate your interest in Gwinnett County.
Casey Beauston, CPPB
Purchasing Associate III
The following pages should be returned with your quote: Quote Schedule, Pages 5-6
References, Page 7
Contractor Affidavit & Agreement, Page 8
IWQ #130841
PERGOLA REPLACEMENT - SPECIFICATIONS
Page 2
I. SCOPE OF WORK
1. Gwinnett County Department of Parks and Recreation is soliciting competitive quotes from
qualified contractors for a pergola removal and installation at Hudlow Tennis Center, located
at Best Friend Park. The successful contractor shall furnish all labor and materials required to
remove and install a new pergola for the Department of Parks and Recreation.
II. DESCRIPTION OF WORK
1. Contractor is responsible for removing ALL construction debris and disposing of it off
premises according to all Environmental Protection Agency (EPA) regulations.
2. The contractor shall remove all joist, rotten structural beams, hangers, ties, and brackets, and
install new wood, beams, hangers, ties, and structural hardware.
3. The contractor shall provide and use all recommended tools per manufacturer’s
specifications.
4. The use of products other than those indicated in Section III Materials must be pre-approved
by the Gwinnett County representative. All products must be applied according to the
manufacturer’s specifications. Any proposed substitution must be submitted with the quote
and must include specifications, colors, warranty, and any other information necessary for
evaluation. The County may reject the quote if this information is not provided.
III. MATERIALS
The successful contractor shall provide the materials below.
• 2” x 10” x 24’ double beams
• 42 pergola joists with decorative ends to match existing ends
• Include hurricane ties brackets and structural hardware
IV. INSTALLATION
1. The double 2” x 10” x 24’ joist shall be installed on existing fiberglass columns.
2. Replace all joists, rotted structural beams, hurricane ties, and brackets.
3. Pressure wash and prepare for paint and caulk if needed.
4. Prime and paint.
V. SPECIAL CONDITIONS
1. Contractor shall use extra care when working around glass doors and windows.
2. Any damage incurred during removal and installation is the contractor’s responsibility to repair.
3. Contractor must provide at least one employee that can effectively communicate with onsite
staff and County staff.
IWQ #130841
Page 3
VI. WORK CONSTRAINTS
1. The affected area will be closed to the public, but the remainder of the facility and park will be
open to the public.
2. Precautions should be taken to block off, barricade, or cover in-process work areas to protect
the surrounding area and general public. If any temporary fencing is needed, the contractor is
responsible for providing.
3. Measurements stated in this document are approximate. The contractor shall be responsible
for obtaining accurate measurements and to become familiar with the conditions of the site
prior to submitting a quote.
4. Hours of work will be agreed upon by the contractor and County staff but generally would be
from 7:30 am-4pm Monday - Friday. Hours could vary depending on location.
VII. GENERAL REQUIREMENTS
1. WORK SITE CLEANLINESS
The contractor shall keep the worksite clean daily, free of debris, and maintain a level of cleanliness
and neatness needed for proper execution of work. The contractor shall keep completed areas clean
and protected from damage for the duration of the project. When all work for the project is
completed, the contractor shall clean the site of debris, waste material, and litter, including disposal
offsite according to EPA regulations; remove all tools, equipment, and surplus materials from the
project site; and remove any temporary protection installed during the project. A final walkthrough
of the project must be scheduled after completion with a designated County representative.
2. SAFETY PRECAUTIONS
a. The contractor shall take proper precautions to prevent fires and to facilitate firefighting
operations.
b. The contractor shall store flammable materials in non-combustible containers and store them
away from potential fire sources and remove flammable waste regularly.
c. The contractor should carefully supervise the operation of potential fire sources.
d. The contractor shall take proper precautions to prevent accidents due to physical hazards, and
provide barricades and signs as required to protect contractor’s personnel and the public from
hazards and to inform them of same. Barricades and signage shall comply with all safety
regulations.
e. The contractor shall provide and require the use of safety equipment, clothing, and accessories
as required by the construction activity and applicable safety regulations.
3. WARRANTY
The contactor must warrant the work, labor, and materials, for a period of one (1) year after
completion of this project. This warranty shall be in addition to any warranties provided by the
product manufacturers.
4. REFERENCES
The selected contractor must have demonstrated successful performance on projects of a similar
size and scope. A minimum of three (3) references shall be provided on the “References” form
included herein. References must clearly demonstrate the successful completion of similar projects
within the past five (5) years.
IWQ #130841
Page 4
VIII. LOCATION
The site is located at:
Hudlow Tennis Center @ Best Friend Park
6224 Jimmy Carter Blvd
Norcross, GA 300071
Tennis Center: 770-417-2210
Main Line: 678-277-0222
Contractors are responsible for taking accurate measurements prior to submitting a quote. No change
orders will be made or accepted based on inaccurate measurements. Quote pricing should be all inclusive
to complete the total job at given location. The site is open to the public. It is strongly encouraged that
interested contractors visit the site prior to submitting a quote to take measurements.
A pre-quote conference has not been scheduled for this project. The site is open to the public for contractors
to view. The County strongly encourages interested contractors to visit the site prior to submitting a quote.
Contractors should contact the location prior to arriving, and reference IWQ #130841.
IWQ #130841
Page 5
FAILURE TO RETURN THIS PAGE AS PART OF YOUR QUOTE DOCUMENT MAY RESULT IN QUOTE BEING DEEMED NON-RESPONSIVE.
QUOTE SCHEDULE
Item
#
1
Description
Lump Sum Fee for Hudlow Tennis Center Pavilion Pergola
Replacement, per above specifications.
Lump Sum Price
$
NOTE: Pricing MUST include all costs associated with this request, including but not limited to labor, materials, disposal, travel, etc.