ENVIRONMENTAL RENOVATION SURVEY REPORT
INSPECTION SITE: Job # CIOMI26002
60 Helwig Street
Milford, CT 06460
CLIENT: Toni Weeks
Risk Manager/Sr. Paralegal
City of Milford
70 West River Street
Milford, CT 06460
TWeeks@milfordct.gov
INSPECTORS: James Twitchell
CT Asbestos Inspector #241
CT Lead Inspector #1822
INSPECTION DATES: October 23, 2026
SITE INFORMATION: Residential
BACKGROUND
Toni Weeks of the City of Milford hired Pennoni to perform an environmental survey for the upcoming demolition
of the residential building at 60 Helwig Street in Milford, CT. Pennoni was retained to document the presence of
asbestos-containing materials and perform TCLP lead sampling on interior and exterior building materials prior
to the upcoming demolition of the structure. There were no previous inspection reports available for review prior
to the inspections.
Limitations
The inspection did not include the detached garage.
Asbestos Sampling Protocol
To determine whether building materials contained asbestos, an asbestos survey was conducted. Samples of the
suspect materials were collected and forwarded for analysis at AmeriSci New York by polarized light microscopy
(PLM) in accordance with EPA procedures. The National Voluntary Laboratory Approval Program (NVLAP)
accredits AmeriSci New York to perform bulk asbestos analysis.
Interpretation of Asbestos Test Results
The regulations of CT Department of Public Health and the US EPA define asbestos containing materials (ACM's)
as materials containing greater than or equal to 1% asbestos. If one or more bulk samples of a homogeneous
material are found to contain greater than or equal to 1% asbestos, then all the homogeneous material is classified
as ACM.
350 Fairfield Avenue, Suite 404 T: 203-324-2222 www.pennoni.com
Bridgeport, CT 06604 Page 1 of 29
| 60 HELWIG STREET, MILFORD, CT ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) Listed below are materials analyzed by polarized light microscopy and found to contain >1% asbestos or that were not tested and assumed to be asbestos containing | |||
|---|---|---|---|
| ACM Description | Location(s) | Estimated quantity | Comments |
| None of the building materials sampled at the site were identified as asbestos containing. |
| 60 HELWIG STREET, MILFORD, CT NOT ASBESTOS CONTAINING BUILDING MATERIAL (ACBM) Includes materials analyzed by polarized light microscopy and found to contain <1% asbestos | |
|---|---|
| Roof Shingle - Top Layer | Roof Shingle - Bottom Layer |
| Exterior Siding - Building Paper | Front Basement - Building Paper |
| Basement Chimney - Flue Insulation | Basement - Plaster |
| Rear Porch Closet - Black paper | Rear Porch Closet - Adhesive |
| Rear Porch Closet - 9x9 FT | Sheet Rock |
CIOMI26002 November 2, 2026 Environmental Renovation Survey
60 Helwig Street, Milford, CT Page 2 of 29
Prior to demolition or renovation, asbestos containing building materials or assumed asbestos containing building
materials should be removed by a licensed asbestos abatement contractor in accordance with the Connecticut
Standards for Asbestos Abatement.
For compliance with OSHA requirements, building materials containing any measurable content of asbestos
should be handled in a manner that will minimize worker exposure to airborne asbestos.
TCLP Lead Sampling Protocol
To evaluate whether painted building materials may be managed as general construction waste or require
disposal as hazardous waste for lead, Pennoni conducted Toxicity Characteristic Leaching Procedure (TCLP)
sampling for lead.
Separate composite samples were collected from the exterior painted wood siding and interior painted wood, wall,
and ceiling materials. The samples were submitted to Phoenix Environmental Laboratories for analysis in
accordance with EPA SW-846 Methods 1311 and 6010D.
Interpretation of TCLP Lead Test Results
TCLP analytical results were evaluated against the EPA regulatory threshold for lead of 5.0 mg/L. Materials
exhibiting lead concentrations at or above this threshold are considered to exhibit the toxicity characteristic for
lead and are subject to applicable hazardous waste management, transportation, and disposal requirements.
Asbestos Containing Building Materials
A copy of PLM asbestos analysis report is provided in Appendix B.
60 HELWIG STREET, MILFORD, CT
ASBESTOS CONTAINING BUILDING MATERIAL (ACBM)
Listed below are materials analyzed by polarized light microscopy and found to contain >1% asbestos or that
were not tested and assumed to be asbestos containing
ACM
Location(s) Estimated quantity Comments
Description
None of the building materials sampled at the site were identified as asbestos containing.
60 HELWIG STREET, MILFORD, CT
NOT ASBESTOS CONTAINING BUILDING MATERIAL (ACBM)
Includes materials analyzed by polarized light microscopy and found to contain <1% asbestos
Roof Shingle - Top Layer Roof Shingle - Bottom Layer
Exterior Siding - Building Paper Front Basement - Building Paper
Basement Chimney - Flue Insulation Basement - Plaster
Rear Porch Closet - Black paper Rear Porch Closet - Adhesive
Rear Porch Closet - 9x9 FT Sheet Rock
| Joint Compound | 2nd Floor Bathroom - 12x12 Stick FT |
|---|---|
| 2nd Floor Bathroom - Ceramic Wall Adhesive | 1st Floor Laundry - Linoleum Adhesive |
| 1st Floor Laundry - Linoleum | Kitchen - Cabinet Adhesive |
| Kitchen - Ceramic Floor Grout | Kitchen - Ceramic Floor Adhesive |
| 1sy Floor Front Living Room - Ceiling | Attic - No Suspect Materials |
| Boiler - New | Water Tank - New |
| Basement Pipes are New Copper |
| Material | TCLP Lead Result (mg/L) | EPA Regulatory Limit (mg/L) |
|---|---|---|
| Exterior Wood Composite | 29.3 | 5.0 |
| Interior Wood, Walls & Ceiling Composite | <0.10 | 5.0 |
CIOMI26002 November 2, 2026 Environmental Renovation Survey
60 Helwig Street, Milford, CT Page 3 of 29
Joint Compound 2nd Floor Bathroom - 12x12 Stick FT
2nd Floor Bathroom - Ceramic Wall Adhesive 1st Floor Laundry - Linoleum Adhesive
1st Floor Laundry - Linoleum Kitchen - Cabinet Adhesive
Kitchen - Ceramic Floor Grout Kitchen - Ceramic Floor Adhesive
1sy Floor Front Living Room - Ceiling Attic - No Suspect Materials
Boiler - New Water Tank - New
Basement Pipes are New Copper
*While the CT DPH and US EPA do not regulate material with <1% asbestos, OSHA does have guidelines that
should be followed for building materials identified as containing <1% asbestos.
TCLP Lead Sample Results
A copy of the XRF data is provided in Appendix C.
Material TCLP Lead Result (mg/L) EPA Regulatory Limit (mg/L)
Exterior Wood Composite 29.3 5.0
Interior Wood, Walls & Ceiling Composite <0.10 5.0
Based on the laboratory analytical results, the exterior painted wood siding exhibits TCLP lead concentrations
exceeding the U.S. Environmental Protection Agency (EPA) regulatory threshold of 5.0 mg/L and, therefore, is
classified as a hazardous waste for disposal purposes. These materials must be managed, transported, and
disposed of in accordance with applicable federal, state, and local hazardous waste regulations.
The interior painted wood, walls and ceilings did not exceed the EPA TCLP regulatory threshold and is not
classified as a hazardous waste. Accordingly, this material may be disposed of as non-hazardous construction
and demolition debris, subject to applicable disposal facility requirements.
CIOMI26002 November 2, 2026 Environmental Renovation Survey
60 Helwig Street, Milford, CT Page 4 of 29
Limitations
The staff of Pennoni has performed its services, within the limits prescribed by our clients, with the usual
thoroughness and competence of the industrial hygiene profession.
The findings in this report are based upon observations and information available to the inspector during the time
of the rendering of the services as described in this report and are based on procedures currently required by
applicable laws, regulations, and ordinances. Pennoni cannot be responsible for conditions or materials the
inspector did not observe due to lack of access or was not otherwise reasonably observable. The conclusions in
this report are professional opinions based solely upon these findings. The findings and conclusions are intended
exclusively for the purpose outlined herein within the scope of work and at the site location and project indicated.
This report is for the sole use of the client. The scope of work performed in execution of this inspection may not
be appropriate to satisfy the needs of other users and any reuse of this document or the findings, conclusions, or
recommendations presented herein is at the sole risk of said user.
Sincerely,
____________________________ 11/02/26
James Twitchell Date
Senior Industrial Hygienist
Associate Vice President, Office Director
CIOMI26002 November 2, 2026 Environmental Renovation Survey
60 Helwig Street, Milford, CT Page 5 of 29
APPENDIX A
Site Photographs
| Project: | CIOMI26002 | Location: | 60 Helwig Street, Milford |
|---|---|---|---|
| Date: | 10/23/26 | Prepared by: | J. Twitchell |
| PHOTO 1 | PHOTO 2 |
|---|---|
| DESCRIPTION Front of House |
| PHOTO 3 | PHOTO 4 |
|---|---|
| DESCRIPTION Side C of House - Rear | DESCRIPTION Side B of House - Driveway Side |
Pennoni
PARTNERS FOR WHAT'S POSSIBLE
Photo Documentation
Project: CIOMI26002 Location: 60 Helwig Street, Milford
Date: 10/23/26 Prepared by: J. Twitchell
PHOTO 1 PHOTO 2
DESCRIPTION DESCRIPTION
Front of House Side D of House
PHOTO 3 PHOTO 4
DESCRIPTION DESCRIPTION
Side C of House - Rear Side B of House - Driveway Side
PHOTO DOCUMENTATION | 1
| PHOTO 5 | PHOTO 6 |
|---|---|
| DESCRIPTION Attic | DESCRIPTION 2nd Floor Bedroom - Front |
| PHOTO 7 | PHOTO 8 |
|---|---|
| DESCRIPTION 2nd Floor Bathroom | DESCRIPTION 2nd Floor Bedroom - Rear |
| PHOTO 9 | PHOTO 10 |
|---|---|
| DESCRIPTION 1st Floor Front Room | DESCRIPTION 1st Floor Living Room |
Pennoni
PARTNERS FOR WHAT'S POSSIBLE
PHOTO 5 PHOTO 6
DESCRIPTION DESCRIPTION
Attic 2nd Floor Bedroom - Front
PHOTO 7 PHOTO 8
DESCRIPTION DESCRIPTION
2nd Floor Bathroom 2nd Floor Bedroom - Rear
PHOTO 9 PHOTO 10
DESCRIPTION DESCRIPTION
1st Floor Front Room 1st Floor Living Room
PHOTO DOCUMENTATION | 2
| PHOTO 11 | PHOTO 12 |
|---|---|
| DESCRIPTION 1st Floor Living Room Ceiling | DESCRIPTION 1st Floor Kitchen |
| PHOTO 13 | PHOTO 14 |
|---|---|
| DESCRIPTION 1st Floor Laundry Room | DESCRIPTION Front Basement |
| PHOTO 15 | PHOTO 16 |
|---|---|
| DESCRIPTION Rear Porch Closet | DESCRIPTION Basement Water Tank |
Pennoni
PARTNERS FOR WHAT'S POSSIBLE
PHOTO 11 PHOTO 12
DESCRIPTION DESCRIPTION
1st Floor Living Room Ceiling 1st Floor Kitchen
PHOTO 13 PHOTO 14
DESCRIPTION DESCRIPTION
1st Floor Laundry Room Front Basement
PHOTO 15 PHOTO 16
DESCRIPTION DESCRIPTION
Rear Porch Closet Basement Water Tank
PHOTO DOCUMENTATION | 3
| PHOTO 17 | PHOTO 18 |
|---|---|
| DESCRIPTION Basement | DESCRIPTION Basement Chimney |
| PHOTO 19 | PHOTO 20 |
|---|---|
| DESCRIPTION Basement Boiler | DESCRIPTION Basement Boiler |
Pennoni
PARTNERS FOR WHAT'S POSSIBLE
PHOTO 17 PHOTO 18
DESCRIPTION DESCRIPTION
Basement Basement Chimney
PHOTO 19 PHOTO 20
DESCRIPTION DESCRIPTION
Basement Boiler Basement Boiler
PHOTO DOCUMENTATION | 4

With GovernmentContracts, you can:
Sale of 327 Main Street The Purchasing Agent, City of Norwich, will receive
State Government of Connecticut
Bid Due: 11/24/2026
Project ID: Title: Hidden Treasures Park - Demolition of Powerhouse Structure RFP Addenda:
Town of New Milford
Bid Due: 11/19/2026
Bid Number: 27-1129 Bid Title: Abatement and Demolition of Ryerson School Category: Town
Town of Madison
Bid Due: 11/19/2026
Project: Sale of 327 Main Street Ref. #: 27-03 Type: RFP Status: Open
City of Norwich
Bid Due: 11/24/2026