Project Description: The project consists of full width reconstruction of Washington Street from Wood Avenue to approximately 75 feet beyond McMillan Ave and consists of:
Roadway: work includes full reconstruction of the roadway section with cement treated base, curb and gutter, planter strip, sidewalks, ADA ramps and driveways. This project also includes partial reconstruction of Wood Avenue to accommodate new utility crossings and improvements to Wood Avenue ADA improvements. This includes an alternative bid for restoration of planter strips with either new top soil or fertilizer amended in place.
Utilities: Replace 6” asbestos concrete watermain, replacement of 8” sanitary sewer main, and new storm system.
Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390.

With GovernmentContracts, you can:
...measures to include riparian and marsh restoration post dam removal, and (3) Sediment ...
Pierce County
Bid Due: 6/24/2026
...control, landscaping, roadside restoration, and other work. Involves 181 items and 183 working ...
State Government of Washington
Bid Due: 7/08/2026
...paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek... transportation systems ...
State Government of Washington
Bid Due: 6/24/2026
...of University Place. The 65-foot long, 22-foot-wide bridge consists of four concrete-slab spans... ...