| Location: | Washington |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Mar 31, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIP 24-04 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of full width reconstruction of Washington Street from Wood Avenue to approximately 75 feet beyond McMillan Ave and consists of:
Roadway: work includes full reconstruction of the roadway section with cement treated base, curb and gutter, planter strip, sidewalks, ADA ramps and driveways. This project also includes partial reconstruction of Wood Avenue to accommodate new utility crossings and improvements to Wood Avenue ADA improvements. This includes an alternative bid for restoration of planter strips with either new top soil or fertilizer amended in place.
Utilities: Replace 6” asbestos concrete watermain, replacement of 8” sanitary sewer main, and new storm system.
Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390.

With GovernmentContracts, you can:
...Contract I-5/I-205, Concrete Panel Rehabilitation Contract summary Requires replacing cement... and other work. ...
State Government of Washington
Bid Due: 6/17/2026
...removing and replacing precast cement concrete panels (PCCP), grinding, removing and replacing... guardrail, ...
State Government of Washington
Bid Due: 6/10/2026
...of roadway and building construction materials including, but not limited to: hot mix ...
City of Sequim
Bid Due: 6/19/2026
...with cement, and proper drainage needs added to allow this change. This acquisition ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/10/2026