| Location: | Washington |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Mar 31, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIP 24-04 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of full width reconstruction of Washington Street from Wood Avenue to approximately 75 feet beyond McMillan Ave and consists of:
Roadway: work includes full reconstruction of the roadway section with cement treated base, curb and gutter, planter strip, sidewalks, ADA ramps and driveways. This project also includes partial reconstruction of Wood Avenue to accommodate new utility crossings and improvements to Wood Avenue ADA improvements. This includes an alternative bid for restoration of planter strips with either new top soil or fertilizer amended in place.
Utilities: Replace 6” asbestos concrete watermain, replacement of 8” sanitary sewer main, and new storm system.
Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390.

With GovernmentContracts, you can:
...Bid Number: PW-0157 Bid Title: SAMMAMISH RIVER & WAYNITA CREEK RESTORATION Category: Request...
City of Bothell
Bid Due: 6/29/2026
...RFP | Fish and Wildlife, On-call River Restoration Engineering/Design Services | Closing Date ...
The Confederated Tribes of the Colville Reservation
Bid Due: 6/26/2026
...measures to include riparian and marsh restoration post dam removal, and (3) Sediment ...
Pierce County
Bid Due: 6/24/2026
...installation, channel reconstruction, channel re-alignment, streambed restoration, roadside... restoration, erosion control, water management ...
State Government of Washington
Bid Due: 7/16/2026