| Location: | Washington |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Mar 31, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIP 24-04 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of full width reconstruction of Washington Street from Wood Avenue to approximately 75 feet beyond McMillan Ave and consists of:
Roadway: work includes full reconstruction of the roadway section with cement treated base, curb and gutter, planter strip, sidewalks, ADA ramps and driveways. This project also includes partial reconstruction of Wood Avenue to accommodate new utility crossings and improvements to Wood Avenue ADA improvements. This includes an alternative bid for restoration of planter strips with either new top soil or fertilizer amended in place.
Utilities: Replace 6” asbestos concrete watermain, replacement of 8” sanitary sewer main, and new storm system.
Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390.

With GovernmentContracts, you can:
...Bid Number: ENG-22-09 Bid Title: SANITARY SEWER REHABILITATION - INFLOW AND INFILTRATON CORRECTION... ...
Oak Harbor city
Bid Due: 7/01/2026
...Bid Number: ENG-22-09 Bid Title: SANITARY SEWER REHABILITATION - INFLOW AND INFILTRATON CORRECTION... ...
Oak Harbor city
Bid Due: 7/02/2026
...Project: Engineering RFQ Ref. #: 20260615 Department: Lake Stevens Sewer District Type: RFQ ...
Sammamish Plateau Water
Bid Due: 7/10/2026
...square yards of pavement repair excavation, 920 linear feet of storm sewer, 27 ...
City of Spokane
Bid Due: 6/29/2026