| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
Bid Title: RFP Police Station Security Fencing Project Category: Tribal Employment Rights Ordinance
Quinault Indian Nation
Bid Due: 6/22/2026
Number IRFP 6569-26 Title Police Extra Duty Coordinator Available Date 6/3/2026 10:00 AM
City of Spokane
Bid Due: 6/24/2026
Project ID: PW#2026-006T Title: Pole Replacement Unit Price Contract 3 North of Denny
City of Seattle
Bid Due: 6/24/2026
SELECT DESIGN ENGINEERING SERVICES for NE 179th STREET IMPROVEMENTS from VICINITY of NE
County of Clark
Bid Due: 7/08/2026