| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
Basic Information Solicitation Number MC-0321006_2.1.01 Title Seattle-Tacoma International Airport South Concourse Evolution (SCE),
Port of Seattle
Bid Due: 10/15/2026
Solicitation Information Title Enterprise Resource Planning (ERP) System Request for Proposal Reference Number
State Government of Washington
Bid Due: 10/16/2026
Basic Information Solicitation Number MC-0322824 Title Rental Car Facility (RCF) Quick Turn Around
Port of Seattle
Bid Due: 10/01/2026
Project ID: Title: Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp). CRP
Pierce County
Bid Due: 9/30/2026