| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...PT16-0448N RFQ 01/04/2027 11 AM Telecommunication PVC Conduit Stick Pipe Specification Register for ...
City of Tacoma
Bid Due: 1/04/2027
...PT16-0448N RFB 01/04/2027 11 AM Telecommunication PVC Conduit Stick Pipe Specification Register for ...
City of Tacoma
Bid Due: 1/04/2027
...INTAKE FISH SCREENS AND FISH PASSAGE PHASE II PIPE REHABILITATION, COLUMBIA BASIN PROJECT, ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/19/2026
...of roadway fill and slide debris, installing a pipe in the drainage trench, ...
State Government of Washington
Bid Due: 6/24/2026