| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...galvanized steel piles for the Sucia Island Marine State Park Pumpout Station. 2. ...
State Government of Washington
Bid Due: 6/16/2026
...to procure and install two galvanized steel piles for the Sucia Island Marine ...
Sammamish Plateau Water
Bid Due: 6/16/2026
...inspections, anode inspection, gauge vessel steel, anode renewals, 100% topside washdown, prepare and ...
State Government of Washington
Bid Due: 7/09/2026
...is seeking qualified firms to provide Fiber Reinforced Polymer and Steel BCT durable ...
King County
Bid Due: 6/16/2026