| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
..., and the construction and installation of new precast concrete deck panels and ...
State Government of Washington
Bid Due: 8/13/2026
...corrosion of the steel piles and other work. Involves 9 items and 180 ...
State Government of Washington
Bid Due: 7/29/2026
..., 18-inch Carbon Steel Globe Body Silent Check Valves to Lower Granite Dam. ...
DEPT OF DEFENSE
Bid Due: 8/13/2026
..., and the construction and installation of new precast concrete deck panels and ...
Sammamish Plateau Water
Bid Due: 8/13/2026