| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...and removal of two (2) tensile fabric tents (3,880 SF), concrete tent foundations, ...
City of Seattle
Bid Due: 9/30/2026
...System, removal of asphalt pavement, concrete sidewalk, and concrete curb and gutter, construction... ...
City of West Richland
Bid Due: 10/13/2026
...crack seal, seal coating, performing profile grinding, hauling and disposal of grinding spoils, ...
Port of Seattle
Bid Due: 9/29/2026
...Concrete Coring 150-07-Boxes, Shoring (For Construction Worker Protection) 959-26-Breakwater Construction... Systems, Including Infrastructure ...
State Government of Washington
Bid Due: 11/20/2026