Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...to) are: Marine Mammal Monitoring Pier Removal Concrete Debris Removal Reimbursement for Protected ...
Sammamish Plateau Water
Bid Due: 7/14/2026
...Requires constructing an eastbound acceleration lane consisting of removal and excavation of existing... ...
State Government of Washington
Bid Due: 7/15/2026
...Project ID: Title: Design Consultant - Chambers Creek Dam Removal and Estuary Bank ...
Pierce County
Bid Due: 6/24/2026
...Mammal Monitoring 2. Pier Removal 3. Concrete Debris Removal 4. Reimbursement for Protected ...
State Government of Washington
Bid Due: 7/14/2026