| Location: | Washington |
|---|---|
| Posted: | Apr 19, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C3914R |
| Publication URL: | To access bid details, please log in. |
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.

With GovernmentContracts, you can:
...FABRICATION" Active Contract Opportunity Notice ID SOLICITATION_NUMBER_386805-1 Related Notice Department...
ENERGY, DEPARTMENT OF
Bid Due: 6/18/2026
...Number ITB 6566-26 Title Miscellaneous Welding-Fabrication Services at Vendor's Shop , To Include... ...
City of Spokane
Bid Due: 6/15/2026
...and fabrication; de-ballasting and re-ballasting; anodes removal and install, tile removal and install... ...
DEPT OF DEFENSE
Bid Due: 6/05/2026